Permit: T02CM03689

Parcel: 13217136A

Inspection Status: Approved

Inspection History: BUILDING - FINAL

Date Description Inspector Results Comments
05/06/2003 BUILDING - FINAL Approved IVRS - Inspection 0000*
01/31/2003 BUILDING - FINAL Partial Approval IVRS - Inspection 0000*1.) STRUCTURAL COMPLETE EGRESS REQUIREMENTS HAVE BEEN MET.
ONLY ITEM REMAINING IS ELECTRIC FINAL. CUSTOMER HAS INSTALLED EQUIPMENT IN DIFFERENT POSITIONS THAN ORIGINAL PLAN AND REQUIRES AS-BUILT AND NEW PANEL SCHEDULE. OK EXTENSION.
12/19/2002 BUILDING - FINAL Denied IVRS - Inspection 0999*1.) PROVIDE FINALS FROM OTHER TRADES.
2.) EGRESS ROUTES NEED TO COMPLY WITH ADA GUIDE LINES IE NO TWISTING OF KIND TO GET OUT.
3.) LOCK ON APA ROUTE MUST UNLOCK AUTOMATICALLY FROM EGRESS SIDE (ADA RESTROOM).
4.) ADA SIGNAGE TO BE 60" FROM FLOOR & MOUNTED ON WALL ON LATCH SIDE. ADA SIGNAGE SHOULD INCLUDE BRAILLE.
10/04/2002 BUILDING - FINAL Partial Approval IVRS - Inspection 0000*1.) OK FOR TEMP OCCUPANCY SUBSTANDARD PRE-EXISTING CONDITIONS HAVE BEEN ADDRESSED. LARGELY BY REMOVING ALL ELECTRIC WIRING THAT WAS DONE IN PAST WITHOUT PERMITS. EXISTING PARKING OK EGRESS ROUTES AND ACCESSIBILITY REQUIREMENTS HAVE BEEN MET. PLUMBING FINAL FOR IT HAS NOT BEEN APPROVED BUT SPACE HAS 2 OTHER RESTROOMS FOR OFFICE AND AN ADA UNISEX ON FACTORY FLOOR.
10/01/2002 BUILDING - FINAL Not ready for Inspection IVRS - Inspection 0000*OK TEMP POWER FOR TESTING EQUIPMENT. 2.) NO T.C.O. UNTIL AREA ABOVE OFFICE CEILING IS BROUGHT INTO A CODE COMPLIANT CONDITION. 3.) I REALIZE THAT THIS PERMIT DOES NOT INCLUDE ALL THE POST TENANTS WORK WITHOUT PERMIT PROBLEMS BUT, I WOULD LIKE MORE OF THE SUBSTANDARD WORK CLEANED UP.