Permit: T02CM02389

Parcel: 140230750

Inspection Status: Denied

Inspection History: PLUMBING - INTERMEDIATE

Date Description Inspector Results Comments
05/29/2003 PLUMBING - INTERMEDIATE Denied IVRS - Inspection 0999*/ 1) TRAP ARM FOR MASTER BATH LAVATORY CAN ONLY HAVE ONE 90 DEGREE 2) APPROVED PLAN SHOWS GAS LINES TO BE LOCATED AT PARTY WALL. CHECK WITH SOUTHWEST GAS ON LOCATION OF METERS FOR 3'-0" CLEARANCE FROM WINDOWS 3) GAS PRESSURE TEST IS OK 4) OVER HEAD WATER DISTRIBUTION AND TEST IS OK
05/29/2003 PLUMBING - INTERMEDIATE Approved IVRS - Inspection 0000*/ 1) WILL REQUIRE A LETTER FROM THE ARCHETECT ALLOWING PEX IN LIEU OF COPPER WATER PIPING 2) INVATORY TRAP ARM EXCEEDS 90 DEGREE CHANGE OF DIRECTION. WILL REQUIRE ADDITIONAL CLEAN-OUT ON TRAP ARM, INSTALLED IN AN APPROVED MANNER AS NOTED ON PLAN PAGE 7 PLUMBING 3) OK TO COVER WALLS
05/28/2003 PLUMBING - INTERMEDIATE Denied IVRS - Inspection 0999*
05/20/2003 PLUMBING - INTERMEDIATE Denied IVRS - Inspection 0999*
1.) MUST PROVIDE 50LBS AIR PRESSURE ON WATER DISTRIBUTION.
2.) MUST USE REQUIRE TEST GAGE ON GAS SYSTEM.J
3.) MUST HAVE MIN 18" OF COPPER BEFORE CONNECTING TO PEX.
4.) MUST USE DRAINAGE FITTING FOR VENT @ KITCHEN SINK.
5.) RETEST ALL SYSTEMS
6.) CLOSET RINGS NOT INSTALLED.
7.) CAN NOT HAVE A 2" TRAP ARM FOR LAVATORY.