Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/19/2003 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection 0000*SENT TO TEP 0820AM SUBJECT TO ALL OTHER INSPECTORS. ALL INSPECTORS HAV SIGNED OFF OK TO CLEAR ECO |
| 08/06/2003 |
ELECTRIC - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) REJECTION PINS ARE NEEDED AT DISCONNECTS 2) WE HAVE MULTIPULE TERMINATIONS AT NEUTRAL BAR 3) FUSE TO BE AS PER PLAN 4) AN APPROVED EXTENDER RING IS NEEDED WHERE COMBUSTIBLE 370.20 SUPPORT DEVICE-AND IF MORE THAN 1/4" FROM BOX TO SURFACE AT NON COMBUSTIBLE 5) SWITCHES TO BE GROUNDED 380.9 6) FINISH ROOF 7) INSTALL ALL PLATES |
| 08/01/2003 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) OK 2" PVC LAST RUNS TO DISCONNECTS |
| 07/30/2003 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection 0000* 1) MAINTAIN 24'' OR COVER IN PARKING LOT AS PER 300.5 |
| 07/29/2003 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 07/10/2003 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection 0000* OK 1" & 2" PVC IN DRIVEWAYS AS MARKED |