Permit: T02CM01019

Parcel: 12620001A


Addresses:

1100 S ALVERNON WY

Inspection Status: Approved

Inspection History: ELECTRIC - UNDERGROUND

Date Description Inspector Results Comments
01/21/2004 ELECTRIC - UNDERGROUND Approved
09/04/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000* POLE BASE GROUNDING #6 SOL. BARE CU. TO POLES. APPROVED.
08/26/2003 ELECTRIC - UNDERGROUND Partial Approval 1) LIGHTS AT SOUTH EAST AREA
08/05/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/ 1) NORTH RAMP TO TRACK WALL 2) SWAT AREA TO PROPERTY WALL 3) UNDERGROUND APPROVED
07/29/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/ 1) OK TO COVER NORTHSIDE, LIGHTING, POWER AND CARD READER
07/25/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/9 POLE BASES W/ GROUND ROD AND WIRE APPROVED AT N.W. PARKING AREA.
06/10/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/ 1) (2)-4" PVC FROM ALVERNON P.P. TO VAULT AREA, ONE FOR QUEST AND ONE FOR FIBER OPTICS
05/12/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*TELEPHONE/DATA PVC TO PHONE CO #9 PULLBOX.
2.) GROUND RODS AND 28 BRAID BELOW CONCRETE AT DRAINAGE WASH.
05/07/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*WEST OF STAIRWAY #3, GROUNDING/LIGHT PROTECTION RODS
3-5" SECONDARIER COMPLETE FROM U.T. TRANSFORM TO SERVICE.
05/02/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*floor boxes.in room 2012 ok.
04/30/2003 ELECTRIC - UNDERGROUND Not ready for Inspection IVRS - Inspection 0000*NO ONE AT SITE, DUPLICATE FROM 4-29
04/29/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*2" PVC FROM TEP TFMR. T0 LOCATION OF TRAFFIC LITE CONTROL PANEL. OK.
04/18/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*LIGHTING PROTECTION GROUNDING, STUBS AND X OTHERMIC WELDS APPROVED AT NORTH WALL RM 1032, GRID LINES 1.C, 2D, 5D AND 9D.
04/07/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*PATHWAY LIGHTING UNDERGROUND COMPLETE.
2 EXOTHERMIC WELDS FOR LIGHTING PROTECT AT ELEC. ROOM #1010. APPROVED.
04/03/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*MAIN ELECTRIC ROOM, UNDERGROUND FOR PANELS PARTIAL.
AND 12 LITE POLE BASES UFER AND UNDERGROUND @ BASE SUP-1
03/27/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*PVC FROM SES TO TFMR. TE. PARTIAL.
2.) PLANTER WEST OF ELECT. ROOM.
3.) SALLY PORT AND RAMPS.
03/19/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*25' OFF 3 RUNS OF 5" RIGID INTO SW GEAR AREA AT SERVICE
2.) ALL RIGID CIELING LIGHTING ON TOP OF T-PAL FLOOR.
3.) FROM GRID LINE 9 TO #1 AND GRID LINE A TO D".
03/11/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*RECEPTACLES UNDER PARKING GRD LINE 3 TO 9.
03/06/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*(3) 5" CONDUITS 20 FT. OUT FROM S.E.S. APPROVED SECONDARYS
02/20/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*LIGHTING PRO. GRND SYSTEM IN MED ROOM. BETWEEN COLUMN LINE 5 AND 6.
02/19/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000* OK GROUND ROD CAP WELDS FOR LIGHTNING PROTECTION EAST OF A LINE SOUTH TO 5 LINE
02/12/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*/ 1) OK UG BRANCH AND MOTOR FEES FROM COL. #7 TO COL. #3 EAST OF 'A' LINE
02/07/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*13 TO 8 AND B TO WASH LINE APPROVAL.
01/30/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*ALL PVC FEEDERS & BRANCH CIR'S BETWEEN A & C COLUMS AND FROM 2 TO 2 NORTH STAIR WELL.
01/29/2003 ELECTRIC - UNDERGROUND Not ready for Inspection IVRS - Inspection 0000*
01/28/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*2-4" PVC'S FIBER,QWEST
1-1" PVC'S FUTURE SECURITY >170' EAST
NORTH O/BLD LINE TO PEDISTAL ISLAND.
01/24/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*ROOM 1006,1005,1004,
#2 2-2" PVC RUNS FROM PNLS A & B TO COLUMN #2.
#3. 1-1 1/4 PVC & 3/4" PVC FROM COLUMN #2 TO ELEV ROOM 1009.
01/17/2003 ELECTRIC - UNDERGROUND Partial Approval
01/16/2003 ELECTRIC - UNDERGROUND Partial Approval CONTINIATION OF 4" QUEST 4" FIBER AND SECURITY COLUMN LINE 6-12 APPROVED.
01/10/2003 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*FIBE AND COMMUNICATION CONDUITS.
W 15FT. OUTSIDE OF ELECTRIC ROOM
COLUMN LINE 1 TO LINE 6 QUEST AND FUTURE FIBRE. FRAN EAST WALL IN COM. ROOM10-12 PAST A.
12/19/2002 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*
1.) TWO 4" PVC FOR COMM.
2.) U/G BOX TO POLE SITE.
12/13/2002 ELECTRIC - UNDERGROUND Partial Approval IVRS - Inspection 0000*SENT TO TEP ON 12/16/02 AT 9:15AM CONST. POWER TEMP POWER INSTALLATION IS OK.