Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T02CM01019
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2003 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection 0000*PERIMETER WALL & SHOT CUTE. | |
| 04/28/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*N BOX . | |
| 04/23/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 04/17/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 04/08/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 04/01/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 03/31/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*STAIRS | |
| 03/20/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*S. ELEC. RM RAMP. | |
| 03/05/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 02/25/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*N WASH. VEH. MAINT. | |
| 02/12/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 02/10/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 02/06/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*RAMP | |
| 02/04/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 01/31/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*GRID 1 TO 1 | |
| 01/27/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 01/24/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 01/23/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*grid #1 & south | |
| 01/16/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*GRID 8 BCD | |
| 01/14/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 01/13/2003 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* | |
| 01/10/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*9 to 12.5 Grid. | |
| 01/09/2003 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* | |
| 01/08/2003 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* | |
| 01/07/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*GRID 3-1 | |
| 01/06/2003 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* 1.) PARTIAL FILL FOOTERS AND F1 FOOTER GRID A/5-8.5. NEED #5 VERTS AT JAMB A 4.75 AND A8.75 2.) PROVIDE AFI FOR OFFSET OF VERTICALS TO BLOCK WALL @ B-25/6. (FOUNDATION VERTS 12" TOO FAR EAT). |
|
| 01/03/2003 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* | |
| 12/31/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*/ 1) COMPLETE VOULT FOOTINGS AREA B6 2) RETAIN FOOTING FOR RAMP AT D.7/S.5-9 INCLUDING RAMP FOOT LINE 7 ALSO LINE S.5/D-E EXCLUDING CORNER AT DS.5 | |
| 12/30/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*1.D.S/9 F2 FOOT SOUTH 2.) 3.75-6/D.S.-E 3.) FB FOOTING B2 B3 B4. |
|
| 12/26/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*1. FB FOOTINGS @/4,5,7,8,9 2.) F20 FOOTINGS @ B/5.5 & 6.5. 3.) F10 FOOTINGS @ DS & D4. |
|
| 12/24/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000* | |
| 12/23/2002 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection 0000*CANCELLED BY CONTRACTOR. | |
| 12/20/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*1.) GRIDLINE D/2,3,6,7,8,9 ISOLATED FOOTINGS #3 RINGS INSTALLED ON A.BOLTS OK TO POUR. | |
| 12/19/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*1.) ISOLATED FOOTING @ D 2,3,6,7,8,9. 2.) 12PM INSPECTION #3 RINGS FOR COL BOLTS NOT INSTALLED HOLD POUR TILL APPROVED. |
|
| 12/18/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 12/17/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*GRID 2.5-7 EAST BLD WALL F3 FOOTING EXTENDED. TO GRID 6' PER ENGINEER. I NEED SPECIAL INSP REPORT FROM 12-9 FOR EAST WALL FOOTINGS GRID 7-15.5. | |
| 12/09/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*OK H BAR @ WALL EXTENSION. | |
| 12/05/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*1.) HEADWALL EXTENSIONS ON CALVERT SEE DETAILS 12 ON C3.2 AND ADOT B-250. 1.) H-H BARS FOR HEADWALLS NOT EXTENDED PER ADOT B-02.50. PLEASE PROVIDE RFI FOR REPAIR OF THIS OVERSIGHT. | |
| 11/26/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000*1.) OK TO POUR CULVERT TOP WHEN CONFORMANCE OBSERVED BY SPECIAL INSPECTOR 2.) FINISH BLOWING OUT DEBRIS CHECK 1" CLEARANCE FROM BOTTOM, KNOCK DOWN HIGH TIE WIRES & COMPLETE INSTALLATION OF BURB. VERTS. |
|
| 11/15/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 11/13/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* | |
| 11/08/2002 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection 0000* BASE OF BOX CALVERT OK TO POUR. |