Inspection History Details
Inspection Status: Compliance
Inspection History: FOLLOW UP CODE VIOLATION
Case Number - T01VL02411
Inspection Description - FOLLOW UP CODE VIOLATION
Inspection Status - Compliance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2001 | FOLLOW UP CODE VIOLATION | Compliance | WATER PERM REPAIRED AND RESTORED. CLOSE CASE. | |
| 09/06/2001 | FOLLOW UP CODE VIOLATION | Correction Required | PERMIT #T01PL01663 WAS ISSUED 8/23/01. REPLACE WATER LINE. FINAL INSP. HAS NOT PASSED. WAITING ON DRAWINGS. F/U ON 30 DAYS ON 10-08-01 | |
| 08/20/2001 | FOLLOW UP CODE VIOLATION | Correction Required | MET WITH OWNER AND CONTRACTOR ON SITE. BLUESTAKE SCHEDULED FOR 8/22/01. WORK TO BEGIN 8/23/01 ON NEW MAIN LINE. TEMP REPAIR HOLDING UP F/U 7 DAYS ON 08-27-01 |