Inspection Status: Compliance
Inspection History: FOLLOW UP CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 10/08/2001 |
FOLLOW UP CODE VIOLATION |
|
Compliance |
WATER LINE FINALED 9/19/01. WATER RESTORED PERM. CLOSE CASE. |
| 09/06/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
PERMIT #T01PL01663 WAS ISSUED 8/23/01. REPLACE WATER LINE. FINAL INSP. HAS NOT PASSED. WAITING ON DRAWINGS. F/U IN 30 DAYS ON 10-08-01 |
| 08/20/2001 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
MET WITH OWNER AND CONTRACTOR ON SITE. BLUESTAKE SCHEDULED FOR 8/22/01. WORK ON NEW MAIN LINE TO BEGIN 8/23/01. TEMP REPAIR HOLDING UP. F/U IN 7 DAYS ON 08-27-01 |