Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/09/2003 |
BUILDING - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 06/06/2003 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) NO ACCESS, PLEASE RECALL |
| 11/25/2002 |
BUILDING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) ROUND DUCT TO BE SUPPORTED, INSULATED AND NEED A ROOF JACK 2) J-BOX NOT INSTALLED CORRECTLY ON ROOF TWO CIRCUIT 3) ROOF JACK FOR PLASTIC CONDUIT 2" SCH 80 REQUIRED-ROOF AND PARAPET 4) ALL DUCTS TO BE SEAL CORRECTLY 5) THERMOSTAT WIRE TO BE IN CONDUIT 6) CONDUIT AND GAS LINES TO BE BLOCKED AND SECURED TO ROOF 7) NEED T3P FOR WATER HEATER 8) GAS PIPING DIAGRAM LEFT ON SITE 105,000 BTU=95 CFH TOTAL RUN OF 153-NEED 1" PIPE TO FIREST TEG 1" TRUNK=158 CFH 9) NEED STUCCO CARD 10) CHECK FIREPLACE INSTALLATION BOOK FOR FLUE AT ABOVE PARAPET 11) CHECK 4 #6 WIRES IN 1/2 CONDUIT 40,000 ROOF PACK HT/COOLING |
| 07/01/2002 |
BUILDING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) CHIMNEY CAP 2) CONDUIT FOR FEEDERS TOO BE IN SCH. 80 PLASTIC 3) CLEAN UP PLASTER GRD ON PARAPETS 4) DUCT TO BE INSULATED TO SMALL 5) NEED TO EXTEND GFCIS 92 OUTLETS AT EXTERIOR) 6) NEED GAS PRESSURE TEST 6) FIREPLACE CAULK AT GAS PIPE HEARTH |