Permit: T01CM03651
Inspection Status: Approved
Inspection History: ELECTRIC - TEMP POWER FOR TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/24/2003 | ELECTRIC - TEMP POWER FOR TEST | Approved | IVRS - Inspection 0000*SENT TO TEP ON 1/27/03 AT 9:15AM OK TO CLEAR TEMP POWER ALL OTHER INSPECTORS SIGNED OFF. 1.) MAIN 200A DISCONNECT OUTSIDE THE LOAD BASE TO BE RELOCATED TO J-FUSE SLOT SO J-SURE WILL BE CLAMPED BY 2 SECTIONS OF BASE. 2.) USE ONLY POWER RECEPTACLES AND LIGHTING AC NOT IN ROOF COOLERS NOT CHECKED. 3.) REPLACE 60AMP SYLVANIA BKR WITH TYPE. |
|
| 01/23/2003 | ELECTRIC - TEMP POWER FOR TEST | Denied | IVRS - Inspection 0999*CANNOT RELEASE POWER UNLESS BOND POSTED FOR TEMP POWER OR COMPLETED CALL PERMIT COUNTER FOR INFO. IF BOND POSTED HAVE ELECTRICAN FINISH ALL TERMINATIONS AT PANEL AND BUTTON UP ALL COVERS & RECALL. |