Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/10/2001 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 08/09/2001 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection 0000*OK TEMP C OF O HOLD FINAL FOR 1.) APPROVED CHANGE ON AC & FAN COIL MOVE TO PNL 1 FROM PNL H, ALSO LOAD CHANGES 2.) ELECT WATER TO BE WORKING HAVE ELECTRIC CONTRACTOR TAPE ORANGE WIRE TO WHITE IN PANEL H AND DISCONNECT BELOW SINK 3.) IF WATER HEATER TO BE 277U - CHANGE 2 POLE CB IN PNL H. NOTE TO OCUPPANT KEEP CLEAR AREA IN FRONT OF PLANELS. |
| 08/08/2001 |
ELECTRIC - FINAL |
|
Partial Approval |
OK FOR TEMP C OF O |
| 08/07/2001 |
ELECTRIC - FINAL |
|
Partial Approval |
1.) CHANGE OUT MAIN C/B AT PNL. A TO 100AMP 2.) PROVIDE APPROVAL BY ENGINEER CORNELL FOR THE CHANGE OF FCU TO 208U 1PHASE AND THE ROOF MTD CONDENSOR TO 208V 3 PHASE NOW FED FROM PNL A. 4.) PROTECT MC CABLE IT CASH WRAP. |
| 08/03/2001 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*1.) COUNTER INSTALL INCOMPLETE. |