Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T01CM02145
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/20/2002 | BUILDING - FINAL | Approved | IVRS - Inspection 0000*ALL PERMITS FOR THIS JOB ARE OK FINAL. | |
06/27/2002 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*1.) PROVIDE APPROVED COMPLIANCE REPORTS FROM KLEINFELDER ENGINEERING 2.) PROVIDE APPROVED FINAL INSPECTION REPORTS FROM FIRE, MECHANICAL ELECTRICAL & PLUMBING INSPECTORS. 3.) EXIT SIGNS IN AREA 13. | |
05/31/2002 | BUILDING - FINAL | Partial Approval | IVRS - Inspection 0000*WHEN LISTED ITEMS COMPLETE PLEASE CONTACT STEVE LONG 791-5550 PARTIAL AREA 13 NOT YET INSPECT FRONT 4,5,6,8 OK FOR TCO PLEASE COMPLETE: 1.) BATHROOM PARTITIONS 2.) SIGNAGE ON RESTROOM DOES 3.) AUTOMATIC CLOSER ON FIRE DOORS. 4.) INSTALLING SIGNAGE ON DOORS TO WAREHOUSE & FACTORY INDICATING AUTHORIZED PERSONNEL ONLY. 5.) PROVIDE APPROVAL FROM FIRE MARSHALL SHOWING FIRE SHUTTERS WORK CORRECTLY. 6.) I NEED TECH CONFIRMATION ON FIRE LITE GLAZING IN 3 HOUR DOOR. THEY STAMPED GLASS 6 MIN. | |
05/15/2002 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*WALK THUR FOR POSSIBLE TEMP. | |
05/07/2002 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*PLEASE PROVIDE COPY OF ENGINEERS FINDINGS AND SUGGESTED REPAIRS FOR DAMAGE CAUSED BY FIRE LINE BREAK. | |
05/03/2002 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*1.) REPAIRS/CLEAN UP BEGUN FOR REPAIRS MADE NECESSARY BY FIREPIPE BREAK. 2.) FOOTINGS FOR MECH EQUIPMENT SHOT WITH TRANSIT AND INDICATE NO MOVEMENT. THERE ALSO HAS BEEN NO MOVEMENT ALONG WALL FOOTING. 3.) DAMAGED SLABS AND DRIVEWAYS BEING REMOVED AND WILL REQUIRE INSPECTION FOR REPLACEMENT. 4.) ENGINEER HAS INSPECTED DAMAGE AND WILL PROVIDE INFORMATION FOR NECESSARY REPAIRS. | |
04/30/2002 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*1.) 12" FIRE PIPE BROKEN ON 4-29 WILL NEED ENGINEERED REPAIR @ EAST MECHANICAL AREA. | |
03/05/2002 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection 0000* MET WITH MIKE LARRABER OF BIG D. GAVE HIM THE FAILED CONCRETE TEST REPORTS AND ASKED HIM TO SET ME APPROVALS FOR S6 DAY INSTEND OF 28 DAY CONCRETE, AND PROVIDE APPROVED REPAIRS OF TESTS THAT FAILED AT 56 DAYS. |