Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 01/11/2002 |
FRAMING |
|
Approved |
IVRS - Inspection 0000* |
| 12/14/2001 |
FRAMING |
|
Not ready for Inspection |
1) ADD BLOCKS UNDER GLU/LAM BEAM AT EXISTING WALL SUPPORT (VERTICAL BLOCK) 2) AT FRONT BEDROOM BROKEN 2 X 10 RAFTER, TRY BLOCKING ON EACH SIDE IT GOES 1/2 UNDER FIREPLACE AND 1/2 EXTENDING OUT ON THE HEARTH SEE FIG 13 INSTRUCTIONS, YOU NEED 2" CLEARANCE TO COMBUSTIBELS AT FLUE CUT BACK WOOD THATS CLOSER, SECURE ROMEX TO/WALL INSIDE CHASE 4) CHECK ALL PIPES AND WIRES FOR SHEETROCK NAIL PROTECTION 5) FINISH FRAMING AT FIREPLACE, BLOCK OFF TOP OF CHASE, FIRE STOP 6) GAS LINE NEEDS TO BE SIZE AND DON'T HAVE TIME TODAY CAN DO IT AT NEXT INSPECTION 7) COULD SOMEONE WITH THIS JOB KNOWLEDGE MEET WITH ME AT NEXT INSPECTION, I HAVE SOME QUESTIONS 8) NEED BTU RATINGS FOR ALL ACTUAL GAS APPLIANCES TO BE INSTALLED 8) ALL GLAZING NOT INSTALLED YET 9) WATER LINE HOLDING PRESSURE 10) NEED GAS PRESSURE TEST |