Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T01CM00807
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2001 | ELECTRIC - FINAL | Approved | ||
07/11/2001 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000*TWO SEISMIC TIES ARE REQUIRED FOR EACH FIXTURE ONE SCREW THROUGH T BAR TO EACH FIXTURE. AT END SUPPORT M.C. CABLE WITHIN 12" OF BOX AND AT EVERY 6 FT. NEED DISCONNECT SWITCH FOR WATER HEATER OR OTHER EFFECTIVE MEANS. NEED TO HAVE METAL EMBOSSED TAPE OR ENGRAVED. METAL TAGS FOR SERVICE ADDRESS AND DISCONNECT NUMBER. |