Inspection Status: Correction Required
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 06/01/2000 |
PLUMBING - GAS PRESSURE TEST |
|
Correction Required |
ADDTL COMMS - 1. GAS PRESSURE TEST OK 2. WATER HTR MUST HAVE ENCLOSURE 3. WATER HTR P&T DRAIN MUST BE OF APPROVED MATERIAL CPVC, COPPER, GALVANIZED AND TERMINATE 6 A.F.F. 4. WATER DISTRIBUTION INSIDE OF DWELLING MUST BE OF APPROVED MATERIAL CPVC, COPPER OR PEX 5. CAN NOT HAVE 2 FLEX CONNECTORS CONNECTED TOGETHER AT DRYER 6. WATER HTR FLU VENT MUST BE MIN 5-0 FROM WATER HTR COLLAR TO FLU CAP TERMINATE 10 MIN. ABOVE ROOF 7. GAS CLEARANCE CARD WILL BE ISSUED AT FINAL NOTE: IF DBL WALL FLU VENT IS USED YOU MUST HAVE MIN 1 CLEARANCE AROUND VENT SINGLE WALL MIN 6 CLEARANCE |