Inspection Status: Approved
Inspection History: ELECTRIC - TEMPORARY POLE
| Date |
Description |
Inspector |
Results |
Comments |
| 07/30/2002 |
ELECTRIC - TEMPORARY POLE |
|
Approved |
IVRS - Inspection 0000* |
| 11/15/2001 |
ELECTRIC - TEMPORARY POLE |
|
Partial Approval |
IVRS - Inspection 0000*1.) TEMP POWER CARRIAGE IN AREA 8. |
| 09/19/2001 |
ELECTRIC - TEMPORARY POLE |
|
Partial Approval |
IVRS - Inspection 0000*PLEASE IDENTIFY EACH SWITCH DISCONNECT, LOAD CENTER, AND TRANSFORMER. PLACE DISTRABATION MAP AT EACH TEMP SERVICE DISTRIBUTION LOCATION. |
| 05/29/2001 |
ELECTRIC - TEMPORARY POLE |
|
Partial Approval |
IVRS - Inspection 0000*1)150 KVA TRANS-INSTALL MBJ-GRD BAR TO NEUT.2)SECURE TRANS TO PAD.3)ID 400AMP PNL SAME AS DISCONNECT AT SERVICE. |
| 05/02/2001 |
ELECTRIC - TEMPORARY POLE |
|
Partial Approval |
IVRS - Inspection 0000* 4" PVC 40 DUCT BANK APPROX. 120' |
| 04/26/2001 |
ELECTRIC - TEMPORARY POLE |
|
Partial Approval |
IVRS - Inspection 0000* OK TO BACKFILL PVC TO SUBS YARD |
| 03/15/2001 |
ELECTRIC - TEMPORARY POLE |
|
Partial Approval |
IVRS - Inspection 0000* |