Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
Permit Number - T00CM05956
Inspection Description - BUILDING PRE-SLAB
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/03/2002 | BUILDING PRE-SLAB | Approved | IVRS - Inspection 0000* | |
01/28/2002 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*GK/5-7;NR/3-5 | |
01/25/2002 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000* | |
01/24/2002 | BUILDING PRE-SLAB | Denied | IVRS - Inspection 0999* | |
01/22/2002 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*PRESLAB. | |
01/18/2002 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*NR/L3; FH/911 | |
01/17/2002 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*GK/11-13/5 LIGHTPOLE BASES F.O. A4 | |
01/16/2002 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*PARTIAL GK/13-15 | |
01/15/2002 | BUILDING PRE-SLAB | Denied | IVRS - Inspection 0999*DENIED 1.) EG/1-3 DID NOT SET. TOWELS @ CONSTRUCTION JOINTS PER DETAIL 11/50-10. 2.) DOWELS CUT 2"-6" LEAVING THEM SHORT OF PLAN DIMENSION OF 18". | |
01/15/2002 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*LOADING DOCKS 9.8-11.4 LOWER SLAB ONLY. | |
01/11/2002 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*PARTIAL EG/11-13;EG/7-9 1.) STOP PLACING CONCRETE IN LIGHT POLE BASES UNTIL REBAR IS PROPERLY SET AND I HAVE APPROVED THEM. | |
01/10/2002 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000* | |
01/09/2002 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*2/S.B AREA | |
01/08/2002 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*NOW APP SPECIAL INSP FOR EPOXIED BARS @ LOADING BOYS. | |
12/21/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*DF/5-7; EQUP PAD @ 9-18-5 | |
12/18/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 00 D THRU F. 3 TO 5 | |
12/12/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*EK/B-15 TO BE REMOVED AND NEW BASE MATERIAL BROUGHT IN THIS IS DUE TO WATER CONTENT. | |
12/11/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*PARTIAL AD/1-5 EK/12-15 CATCHEMENT WALLS IN LIGUID RECEIVEING. | |
12/10/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*1.) DRAIN CANALS IN LIQUID RECIEVING OK 2.) A-D/3-5 OK; E-K/13-15. | |
12/07/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*EMBED PLATES TO BE PULLED & RESET DUE DRY NESS OF CONCRETE WHEN PLATES SET PROPER CONSOLIDATION OF CONCRETE AROUND EMBEDS TO BE OBSERVED BY SPECIAL INSPECTOR. | |
12/06/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*F-H/15-14; AE4/9-7. | |
12/04/2001 | BUILDING PRE-SLAB | Not ready for Inspection | NOT READY FOR INSPECTION. | |
12/03/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000* | |
12/03/2001 | BUILDING PRE-SLAB | Not ready for Inspection | IVRS - Inspection 0000*MEZZANINE FLOOR OK. | |
11/30/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*D13,5 E15.9,LIQUID RECIEVING OK. | |
11/29/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*PARTIAL LIQUID RECEIVING EXCEPT CANALE. | |
11/28/2001 | BUILDING PRE-SLAB | Not ready for Inspection | IVRS - Inspection 0000*NOT READY LIQUIRD RECIEVING NEEDS TO BE SEEN BEFORE POURING. | |
11/27/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*SOUTH SIDE AT LIQUID RECEVING PER CONVERSATION. WITH KLEM FELDER INSPECTOR LOUIS RIOS; A-P/5-9;A-E/9-12' DRY POWER ROOM. | |
11/09/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*SOUTH SIDE A-8 OK. | |
11/08/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000* | |
11/07/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*SOUTH SECTION OF A 6/8 OK. 1.)NORTH SECTION OF A 6 & 8 REQUIRES #3 REBAR 16" O.C. EACH WAY NOT 18" 2.) RECESSED SLAB NOT PER PLAN | |
11/06/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000* | |
11/05/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*A-D/15-18 AREA 5 | |
11/02/2001 | BUILDING PRE-SLAB | Not ready for Inspection | IVRS - Inspection 0000*NOT READY | |
10/29/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*E,W,N OF START CRANE OK 2.) I WOULD LIKE TO SEE RFI FOR#4 @ 18' EACH WAY IN 6" SLAB. | |
10/26/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000* | |
10/17/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*SLABS NOTE #4 REBAR 16" EACH WAY PLAN CALLS FOR MESH OK PER RFI244 | |
10/12/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*BOTTOM OF TRENCHES IN A-3 EQUIP ROOM. | |
10/09/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*CORRADOR TO CAFETERIA. | |
10/05/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*PROCESS ROOM ABOVE & BELOW. | |
10/03/2001 | BUILDING PRE-SLAB | Not ready for Inspection | IVRS - Inspection 0000* | |
09/28/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*MEZZANINE @ W. AND CORRIDOR. | |
09/26/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*A3 INSIDE STEM WALL ELEVATOR; RETAIN STEM @ DOCK. | |
09/21/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000*PIER CAPS NEED 1 1/2 A CLEARANCE FROM REBAR TO TILT PANEL ON K-LINE PLEASE CLEAN DEBRIS FROM BOTTOM OF ELEVATOR PIT BEFORE POURING. | |
09/20/2001 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection 0000* | |
02/15/2001 | BUILDING PRE-SLAB | Not ready for Inspection | IVRS - Inspection 0000* |