Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2001 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection 0000* | |
| 06/01/2001 | PLUMBING - INTERMEDIATE | Partial Approval | 1)N/H DWV UNDERGROUND COVERED AND POURED BEFORE HE WAS ABLE TO INSPECT.CONTRACTOR PROVIDED 5# AIR TEST ON ENTIRE DWV SYSTEM.2)N/H DWV IN WALLS OK #5 #AIR TEST OK.OK TO COVER.3)COPPER IN WALLS OK 100 #AIR TEST OK.OK TO COVER.4)CONDENSATE PIPING IN WALLS OR TO COVER.5)WHERE BUILDING DRAIN MEETS BUILDING SEWER AT 2 WAY.OK TO COVER-WIL SEE CONTINUATION AT HCS INSPECTION.6)WILL CHECK "AS BUILD" FOR EXTRA ROOF DRAIN DURING ABOVE CEILING INSPECTION. | |
| 05/30/2001 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999*1)AS I DISCUSSED WITH THE PROJECT MANAGER AT SCHOOL.I WILL REQUIRE A 5# AIR TEST IN THE PLUMBING ROUGH/SOIL;AT THIS STAGE IN CONSTRUCTION, A WATER TEST IS MORE DETERMINENT OF CONDITIONS.2)PLEASE EXPOSE ALL FITTINGS AND PIPE FOR INSPECTION-THIS MEANS REMOVE INSULATION, DRYWALL ETC.3)CONDENSATES DRAINS NOT COMPLETE. | |
| 05/16/2001 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999* 1) THE CONTRACTOR HAS NOT SATISFIED THE ADMINISTRATIVE AUTHORITY THAT THE N/H DWV UNDER GROUND HAS PASSED INSP. WE WILL NOT PROCEED WITH INSPECTIONS UNTIL INSP. ARE BROUGHT UP TO DATE 2) AS A COURTESY, I HAVE LOOKED AT THE ROOF DRAINS, AND WITH THE EXCEPTION OF A FEW MISSING HANGERS, REQUIRED WITHIN 18" OF EACH CHANGE OF DIRECTION OR COUPLING THE ROOF DRAINS ARE INSTALLED TO 94 UPC THERE IS ONE BRANCH AT THE SOUTHWEST DRAIN NOT SHOWN ON THE PLAN. I STILL NEED TO VERIFY WHERE IT TIES IN WATER TEST OK OK TO DRAIN |
|
| 05/10/2001 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999* 1) NO CHANGE FROM LAST INSP 2) I NEED TO SEE APPROVAL OF DWV UNDER GROUND BEFORE ANY THING ELSE CAN BE PASSED | |
| 05/02/2001 | PLUMBING - INTERMEDIATE | Denied | 1) I NEED TO SEE WHERE THE ADMINSTRATIVE AUTHORITY HAS APPROVED THE PLUMBING ROUGH/SOIL 2) NO WATER TEST ON DWV SYSTEM 3) ROOF DRAIN CONNECTIONS COVERED BY INSULATION 4) NO CHANGE FROM FIRST INSP. |
|
| 05/01/2001 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999* 1) PLEASE PROVIDE INSP. HISTORY INCLUDING ROUGH PLBG/SOIL APPROVAL 2) N/H DWV NO WATER TEST 3) MAKE SURE ALL PIPING AND FITTINGS ARE EXPOSED FOR INSP. |