Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T00CM05109

Parcel: 128100570


Addresses:

5441 E WILLIAMS BL

Inspection Status: Partial Approval

Inspection History: NPPO - FINAL

Date Description Inspector Results Comments
10/26/2001 NPPO - FINAL Partial Approval ALL TOS AND PIP PLANTS ON SITE. MONITORING REPORT RECEIVED 10/19/01.

NOTE: DECOMPOSED GRANITE REQUIRED INBETWEEN CURB AND SIDEWALK IN FRONT OF BUILDINGS TWO AND THREE.
08/28/2001 NPPO - FINAL Partial Approval MONITORING REPORT REQUESTED:

1. SUBMIT A REDUCED COPY OF THE DEVELOPMENT PLAN WITH THE LOCATION OF THE LISTED PLANTS ABOVE.

2. SUBMIT A LETTER STATING THE CONDITION OF THE TOS PLANTS AND MITIGATION EFFORTS IF TOS FAILED.
07/26/2001 NPPO - FINAL Partial Approval MONITORING REPORT REQUIRED UPON FINAL INSPECTION FOR APPROVAL OF THE SITE.

1 TOS BARREL
2 TOS GREYTHORN
2 TOS HACKBERRY
7 TOS MESQUITE
5 TOS BLUE PALO VERDE
1 PIP MESQUITE LOCATED NORTHWEST
D00-0041