Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T00CM05109
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2001 | PLUMBING - INTERMEDIATE | Approved | REVIEWED REVISED PLUMBING DRAWING ALLOWING 4" ROOF DRAINS IN LIEN OF 5" ROOF DRAINS REVISED APPROVED DRAWING REFLECTS INSTALLATION 2.)OK TO COVER. | |
07/09/2001 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999*REVIEW APPROVED PLANS FOR ROOF DRAIN CORRECTIONS 1.) JOB SITE TRAILER WAS LOCKED. NO ACCESS TO APPROVED DRAWINGS. | |
07/06/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*COORDINATING GAS SERVICES WITH CONTRACTOR CALLED JIM. M. AND DISCUSSED OF GAS SERVICE | |
06/28/2001 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999*1.) DECK DRAINS AT EAST AND WEST ENDS OK WATER TEST OK OK TO COVER 2.) I CANNOT COMPLETE THE INTERMEDIATE INSPECTION ON SHELL CONTRACT UNTIL I SEE REVISED, APPROVED DRAWING ON REVISION OF ROOF DRAINS. DO NOT COVER ROOF DRAINS UNTIL THESE APPROVED DRAWINGS ARE REVIEWED BY ME AND OK. SEE NOTE 060601 AND NOTE 2 061301 | |
06/19/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*PLUMBING ABOVE CEILING OK. 2)STILL NEED TO SEE DECK DRAINS AT EAST, AND WEST SIDE. |
|
06/14/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1)CONDENSATE DRAIN TO MOP SINK.2)OK TO "DRYWALL". | |
06/13/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*3040: PLUMBING YARD WATER: 1. FINAL PIPING & CONNECTIONS OK, PLEASE DO NOT COVER UNTIL AFTER INSPECTION. 3050 PLBG GAS: 1. GAS PIPING OK 2. PRESSURE TEST OK. 3035: 1. NEED TO COMPLETE CONDENSATE PIPING. 2. BEFORE FINAL, PROVIDE REVISED APPROVED DRAWING SHOWING ROOF DRAIN HEADER SIZE CHANGE. 3. NEED TO SEE DECK DRAINS ON EAST & WEST SIDES. | |
06/12/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1)ROOF DRAINS IN NORTH SIDE OK.WATER TEST OK.2)DECK DRAINS OK.WATER TEST OK.3)OK TO DRAIN.4)SEE NOTE #3 ON 3/13/01 EXPOSE ALL FITTINGS. | |
06/06/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1)ROOF DRAINS, AND SETS IN SOUTH SIDE OK.WATER TEST OK-OK TO DUMP. NOTE*ARCHITECT APPROVED CHANGE OF 5" RAINLEADERS TO 4" WITH 1/2" PITCH PER FOOT. 2 SETS OF RAINLEADERS INSTALLED PER ACHITECTS INSTRACTION. |
|
06/05/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1)FIRST FLOOR AND SECOND FLOOR ABS IN BATHROOMS OK.WATER TEST 10' HEAD ABOVE 2 ND FLOOR OK.2)FIRST FLOOR COPPER IN BATHROOMS OK 100# AIR TEST OK. 3)OK TO COVER WALLS AND CEILINGS FIRST FLOOR BATHROOMS ONLY. |