Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/28/2000 | ELECTRIC - FINAL | Approved | IVRS - Inspection 0000* | |
| 12/22/2000 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0215* THE NEC REQUIRES EACH CABLE TO BE TERINATED IN ITS OWN TERMINAL LUG, THE GARGED WIRES AT BOTH MAIN SWITCHES ARE NOT ACCEPTABLE. IF YOU HAVE THE MANUFACTURS DESCRIPTION, SPEC'S , U/L LISTING ETC, ALLOWING GAUGING OF WIRES IN THE INSTALLED LUGS PLEASE PRESENT THIS INFO TO MR. RANDY SCHULER AT COT- DSC FOR HIS REVIEW AND APPROVAL, PROVIDE STAMPED FOR HIS REVIEW AND APPROVAL, PROVIDE STAMPED COPY ON SITE FOR THIS INSPECTOR |
|
| 12/18/2000 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection 0000* |