Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date |
Description |
Inspector |
Results |
Comments |
| 01/16/2001 |
EXT METAL CLIPS/EXT SHEATHING |
|
Approved |
IVRS - Inspection 0000* |
| 12/04/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Denied |
IVRS - Inspection 0999*/1. NORTH AND SOUTH WALLS HAVE 2 LAYERS OF O.S.B. SHIMMING UP AND BEARING THE WEIGHT OF THE TRUSSES AND THE TRUSS CLIPS DO NOT ATTACH TO THE DOUBLE TOP PLATE. PROVIDE CITY OF TUCSON, ENGINEERS, AND YOUR ARCHITECT PROVIDE AN APPROVED DETAIL OF THIS CONSTRUCTION. 2. POST TENSION PLANS MUST BE APPROVED BY CITY OF TUCSON. 3. CITY APPROVED TRUSS DRAWINGS MUST BE ON SITE. 4. MANY ROOF PANELS LOOSE REMOVE SHINERS AND RENAIL. 5. 1/8" END AND EDGE CLEARANCE REQUIRED ON O.S.B. ROOF PANELS. |
| 10/31/2000 |
EXT METAL CLIPS/EXT SHEATHING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/1. PLAN LEFT FOR INSPECTION DOES NOT MATCH AS BUILD. 2. POST TENSION PLAN MATCHES FLOOR BUT NOT APPROVED BY C.O.T. 3. TRUSS CALC'S LEFT DO NOT MATCH AS BUILT. (HOUSE LAYOUT). 4. MAY REQUIRE ADDITION SHEAR AT BACK OF HOUSE. 5. BEDROOM CLOSET (SOUTH OF FOYER) DOES NOT MATCH SITE PLAN THERE MAY BE AN EGRESS PROBLEM. CONTRACTOR RESPONSIBLE TO PROVIDE CORRECT SITE, FRAMING AND TRUSS LAYOUT FOR AS BUILT. |