Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2000 | MECHANICAL - ABOVE CEILING | Approved | IVRS - Inspection 0000* ABOVE CEILING LOOKS GOOD OK TO COVER |
|
| 10/04/2000 | MECHANICAL - ABOVE CEILING | Denied | 10/04/00 SUPPLY SHT METL DUCTS NEED TO BE INSULATED 2. ABS WET VENTS IN PLEMIUM NEED TO BE CHASSED. DUCT WRAP DOES NOT CONSTITUTE AND ACCEPTABLE CHASE |
|
| 09/25/2000 | MECHANICAL - ABOVE CEILING | Partial Approval | AREA ABOVE GRID IS PLENIUM IS RETURN AIR, NO COMBUSTIBLES ARE TO BE LOCATED IN SPACE. INCLUDE NEW UNIT REPLACED ON ROOF TO PERMIT HAVE COMPLETE PROPER FUSING, COND. DRAINS, ETC FOR FINAL |