Inspection Status: Approved
Inspection History: PLUMBING - PROGRESS
| Date |
Description |
Inspector |
Results |
Comments |
| 07/23/2001 |
PLUMBING - PROGRESS |
|
Approved |
|
| 06/26/2001 |
PLUMBING - PROGRESS |
|
Partial Approval |
1.) SHOWER VENT,REPAIRED VENT, TEP DRAIN OK 2.) OK TO SHEETROCK ALL AREAS |
| 06/13/2001 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000*1. MEN'S & WOMEN'S BATHROOMS, 1. ABS DWV OK TO ABOVE CEILING WATER TEST 1O' HEAD. 2. COPPER IN BATHROOMS OK, PRESSURE TEST OK, 3, OK TO SHEETROCK BATHROOMS 4. NEED TO SEE: SHOWER VENT, REPAIRED VENT, PT R FOR BATHROOM |
| 05/28/2001 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000*1)TIE-IN TO INTERCEPTOR OK.2)INTERCEPTOR TO BACKWATER VALUE OK.3)BACKWATER VALUE TO SEWER TIE IN OK.4)WATER TEST ON SEWER, INTERCEPTOR, TO BACKWATER VALUE OK.5)NEED TO SEE VENT INTERCEPTOR, AFTER BACKFILLED.5)OK TO BACKFILL INTERCEPTOR. |
| 03/27/2001 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000* 1) 3" HORIZONTAL VENT BELOW FLOOD RIM OK 2) WILL RED LINE ON AS BUILTS. NOTE: BY INCREASING HORIZONTAL VENT ONE PIPE SIZE WE WERE ABLE TO EXTEND IT TO NEAREST PARTITION |
| 03/19/2001 |
PLUMBING - PROGRESS |
|
Partial Approval |
IVRS - Inspection 0000* 1) 4" DRAIN IN MIDDLE OF HANGER HAS A 2" VENT SEE TABLE 7-5 ONLY 1/3 OF DEVELOPED LENGTH OF VENT MAY BE RUN IN A HORIZONTAL POSITION 2) BE SURE AND RED LINE THE CHANGE TO PLAN |