Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/07/2000 |
ELECTRIC - FINAL |
|
Correction Required |
ADDTL COMMS - 1. ELECTRICIAN VERIFY THAT THE NEUTRAL BUSS AT THE SUB-PANEL IS INSULATED FROM THE CAN. 2. ID THE SPA BREAKERS OK 3. REGARDING THE 12 GA CONDUCTORS FROM THE SUB-PANEL TO THE PATIO AREA NOT YET CONNECTED. IT APPEARS THAT YOU WILL BE SHORT ON BREAKER SPACE FOR THESE CONDUCTORS. NO DOUBLE LUGGING AND BE SURE TO USE BREAKERS WHICH ARE APPROVED FOR THE SUB. PANEL. ID ALL BREAKERS. SUGGESTIONS: RUN GAS LINE ABOVE GRADE IN CARPORT 2. PROVIDE SHEET METAL FLASHING TO PROTECT WATER LINE WHERE IT PASSES OVER STEP TO FURNACE. 3. PROVIDE A LISTED VENT CAP ON THE WATER HEATER VENT. WE NOW REQUIRE 2 DRIVEN GROUNDS (6 APART) AT THE ELECTRICAL SERVICE. I RECOMMEND ADDING ANOTHER GROUND ROD. |
| 04/07/2000 |
ELECTRIC - FINAL |
|
Partial Approval |
PARTIAL APPROVAL |
| 04/05/2000 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
NOT READY |