Permit: T00CM00852

Parcel: 12109290B


Addresses:

2221 N ROSEMONT BL

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
10/10/2002 PLUMBING - FINAL Approved IVRS - Inspection 0000*PLBG. FINAL IS OK 2.) ALL REVISIONS OF WASTE & VENT SYSTEM HAVE BEEN MADE & APPROVED. 3.) OK FOR C OF O.
08/02/2002 PLUMBING - FINAL Partial Approval IVRS - Inspection 0000*1.) PLBG FINAL A SOUTH WING 1ST & 2ND FLOORS IS OK 2.) NOTE: MUST PROVIDE REVISED & APPROVED DRAWINGS ON ALL REVISIONS ON WASTE & VENT SYSTEM AND SITE SEWER.
07/16/2002 PLUMBING - FINAL Partial Approval IVRS - Inspection 0000*1.) KITCHEN IN BLDG C FINAL IS OK 2.) OK FOR TEMP C OF O.
07/10/2002 PLUMBING - FINAL Partial Approval IVRS - Inspection 0000*1.) OK FOR TEMP C OF O. 2.) FOR BLDG C ONLY. 1.) TRIPLE COMT SINKS REQUIRES C.O. @ UPSTREAM END OF CONTINUOUS WASTE 3.) GAS SHUT OFF VALVES MUST BE MAX 3'-0" FROM REGULATOR. 4.) MEN RESTROOM URINAL FLUSH VALVE DISCHARGE TUBE MUST HAVE MIN 6" FROM C L LEVEL TO TOP OF FIXTURE. 5.) LINT CATCHER @ LAUNDRY RM REQUIRES A BACKFLOW PREVENTER #007. 6.) REMOVE OLD 3" PVC FROM A.W. DRAINS AND REPLACE WITH NEW PIPE (GREEN GLUE WITHIN STRUCTURE. 7.) FLOW CONTROL VENT CONNECTION MUST BE BRASS.
06/25/2002 PLUMBING - FINAL Partial Approval IVRS - Inspection 0000*
06/10/2002 PLUMBING - FINAL Partial Approval IVRS - Inspection 0000*1.) PLBG. FINAL IS OK FOR WING C NORTH ONLY.
06/05/2002 PLUMBING - FINAL Denied IVRS - Inspection 0999*1.) PLBG FINAL FOR RMS C-110 C-109, C-111,C-116,C-119, C-125,C-126 IS OK 2.) COUNTER TOPS FOR MENS & WOMENS RESTROOMS DOES NOT MEET ADA REQUIREMENTS ON HEIGHTS FROM FINISH FLOOR.
11/20/2001 PLUMBING - FINAL Partial Approval IVRS - Inspection 0000*1.) PLBG. TEMP C OF O. IS OK FOR BLDG. A ONLY.
08/31/2001 PLUMBING - FINAL Partial Approval IVRS - Inspection 0000*1.) PLBG FINAL FOR BLDG. B 2ND FLOOR IS OK.
08/30/2001 PLUMBING - FINAL Denied IVRS - Inspection 0999*1.) MUST REMOVE ALL PANELS @ LAVATOR BEFORE INSPECTION AS REQUESTED 2.) SEVERAL WATER CLOSETS AND SHOWER TRIM NOT INSTALLED 3.) CALL WHEN 100% COMPLETED.
08/22/2001 PLUMBING - FINAL Partial Approval IVRS - Inspection 0000*1.) FIRST FLOOR BLDG. B FINAL IS OK.