Permit: T00CM00852

Parcel: 12109290B


Addresses:

2221 N ROSEMONT BL


Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Permit Number - T00CM00852

Inspection Description - PLUMBING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
10/10/2002 PLUMBING - INTERMEDIATE Approved
06/25/2002 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*LEFT UTILITY CLEARANCE CARD FOR BLDG. C ONLY.
05/13/2002 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1.) RAIN LEADER WATER TEST FOR SOUTH A WING IS OK 2.) CLOSET RINGS HAVE BEEN SET IN SOUTH A WING 1ST & 2ND FL.3.) OVERHED WATER DISTRIBUTION IN MECH RM BLDG. C 1S OK.
04/23/2002 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK 2.) THIS INSPECTION IS FOR BLDG. A SOUTH 1ST FLOOR INTERMEDIATE 2ND FL ROUGH SOIL 3.) OVERHEAD WATER DISTRIBUTION IS OK.
04/23/2002 PLUMBING - INTERMEDIATE Partial Approval BLDG C 4" TO 6" SDR 35.
04/15/2002 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1.) WASTE & VENT SYSTEM IS OK 2.) OVERHEAD WATER DISTRIBUTION IS OK 3.) OK FOR DRYWALL. 4.) THIS INSPECTION IS FOR BLDG. C NORTH ONLY.
04/11/2002 PLUMBING - INTERMEDIATE Denied IVRS - Inspection 0999*1.) MUST HAVE A HANGER EVERY 4'-0" ON HORIZONTAL VENTS @ RESTROOM ON NORTH END OF BLDG. 2.) MUST USE A DIRECTIONAL FITTING WHEN EXTNDING A C.O. 3.) CAN NOT REDUCE TRAP ARM FROM 2" TO 1 1/2 FOR SINK IN DENTAL RM.
03/29/2002 PLUMBING - INTERMEDIATE Partial Approval 1.) GAS PRESSURE TEST OF 60IBS FOR MED. PRESSURE GAS SYSTEM SOUTH C BLD ONLY IS OK 2.) RAIN LEADERS FOR NORTH C BLDG. IS OK.
03/27/2002 PLUMBING - INTERMEDIATE Partial Approval 1.) WASTE & VENT SYSTEM OK 2.) OVERHEAD WATER DISTRIBUTION IS OK 3.) OK FOR DRYWALL. 4.) THIS INSPECTION IS FOR BLDG C SOUTH ONLY.
03/26/2002 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*OK FOR DRYWALL FOR SOUTH WALL DRYER.
03/22/2002 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*
03/15/2002 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1.) AIR PRESSURE TEST FOR 18" & 12" RAIN STORM DRAINS IS OK. 2.) FINAL CONNECTIONS TO RAIN LEADERS @ BLDG. A COURT YARD IS OK.
09/14/2001 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection 0000*
08/29/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1.) 2ND FLOOR BLDG. A WASTE & VENT SYSTEM IS OK 2.) OVERHEAD WATER DISTRIBUTION IS OK 3.) OK FOR DRYWALL.
08/28/2001 PLUMBING - INTERMEDIATE Denied IVRS - Inspection 0999*STILL MISSING ISOLATOR IN WATER DISTRIBUTION CHECK SYSTEM 2.) HORIZONTAL VENT FOR SINKS @ FOYER A219 EAST SIDE MUST HAVE A HANGER EVERY 4'0"
08/24/2001 PLUMBING - INTERMEDIATE Denied IVRS - Inspection 0999*1.) MISSING LOTS OF ISOLATORS ON WATER DISTRIBUTION IN PLBG WALLS 2.0 MUST REMOVE REPAIR COUPLING AND HARD PIPE NEW 2U WATER SERVICE DO NOT COVER.
08/09/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1.) WASTE & VENT SYSTEM IS OK FOR UNITS FROM COLUMN AF NORTH TO AA AND COLUMN #1 THRU 7 2.) OVERHEAD WATER DISTRIBUTION IS OK 3.) OK FOR DRYWALL UPON BLDG. INSPECTORS APPROVAL.
07/11/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1.) 1ST FLOOR BLDG. A SOIL WATER TEST OK 2.) RAIN LEADER WATER TEST IS OK 3.) OXECHEAD WATER DISTRIBUTION & WALLS ARE OK 4.) NOTE: CLOSET RINGS HAVE NOT BEEN SET @ THIS TIME.
07/09/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1.) SOIL WATER TEST OK FOR BLDG A 1ST FLOOR FROM COLUMN #AL TO AA NORTH AND FROM COLUMN #1 TO 8 WEST 2.) OVERHEAD WATER DISTRIBUTION AND HYDROSTATIC TEST 100 IBS IS OK.
06/20/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1)WASTE AND VENT SYSTEM ON BUILDING B SECOND FLOOR SOUTH END IS OK.
2)OK FOR DRYWALL UPON BUILDING INSPECTORS APPROVAL.
06/19/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1)BUILDING B 2ND FLOOR SOUTH END FROM COLUMN #BK THEN #BP AND COLUMN #1 THRU #9 MUST HAVE OVERLOAD 2" VENTS HUNG EVERY 4'-0".2)RE VENTS HORIZONTAL MUST BE 42" AFF.3)NO OFFSETS ON PIETY ARMS.
4)OVERLOAD WATER DISRIBUTION OK FROM COLUMN A-B TO AL AND FROM COLUMN 1 THEN B.
TEST 100 LBS OK, OK TO INSULATE.
06/11/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1)WASTE AND VENT SYSTEM OK.2)OVERLOAD WATER DISTRIBUTION OK.3)OK FOR DRYWALL.4)THIS INSPECTION IS FOR BUILDING B 2ND FLOOR FROM COLUMN #BF TO BK AND FROM COLUMN #2 TO WEST #10.
06/05/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1)WASTE AND VENT SYSTEM OK.2)OVERLOAD WATER DISTRIBUTION OK.3)OK FOR
DRYWALL UPON BUILDING INSPECTION APPROVAL.
4)NOTE:THIS INSPECTION IS FOR BUILDING #B 2ND FLOOR FROM COLUM #BF TO NORTH BA AND COLUM #1 THRU 9 ONLY.1)AIR PRESSURE TEST FOR SITE SEWER FOR MANHOLE AND P.L. LINE OK.
05/18/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1)RAIN LEADER WATER TEST OK.2)THIS INSPECTION IS FOR BUILDING B CENTER WING WEST END OF BUILDING.
05/16/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000* 1) 6" SITE SEWER FOR BLDG B FROM 6" CLAY MAIN TO BLDG DRAIN OK 2) AIR PRESSURE TEST OK 3) OK TO BACKFILL
05/11/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000* 1) RAIN LEADER WATER TEST OK 2) THIS INSP IS FOR CENTER WING BLDG #B ONLY
05/10/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000* 1) SOIL WATER TEST OK
2) OVER HEAD WATER DISTRUBUTION OK
3) THIS INSP. IS FOR BLDG B 1ST FLOOR FROM COLUMN #BN SOUTH TO #BP AND COLUMN LINE #1 THRU #3 OK ONLY 4) OK TO DRYWALL UPON BLDG INSP. APPROVAL 5) RAIN LEADER WATER TEST OK
RAIN LEADERS OK FROM COLUMN LINE #1 TO 9 AND BK NORTH BA ONLY. NOTE: CENTER WING BLDG B NOT COMPLETE AT THIS TIME
05/09/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000* 1) RAIN LEADER WATER TEST OK FOR BLDG B FROM COLUMN #BD TO NORTH #BA AND COLUMN #1 TO WEST #9 ONLY. 2) NOTE: RAIN LEADERS IN ROOM #245, 246 HAS EXCEEDED 135 DEGREES HORIZONTAL RULE. RE TEST THESE RAIN LEADERS AFTER CORRECTIONS HAVE BEEN MADE
05/04/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000* 1) SOIL WATER TEST OK
2) WATER DISTRIBUTION IN WALL OK 3) OK FOR DRYWALL UPON BLDG INSP OK 4) THIS INSP IS FOR UNITS BETWEEN COLUMN #BF TO SOUTH TO #BN AND WEST TO #10
05/03/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*
04/17/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*1. ALL CORRECTIONS HAVE BEEN MADE FROM COLUMN # BF TO NORTH END OF BLDG. 2. OK FOR DRYWALL UPON BLDG INSPECTORS APPROVAL.
04/16/2001 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000* 1) UNIT B-156 TOO MANY FIXTURES ON 1/2" CU 2) SUPPORT COLD VERTICAL PIPING IN WALLS WHERE NEEDED 3) OK TO START INSULATING OVER HEAD HOT FROM BF-NORTH
12/18/2000 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection 0000*
RAIN LEADER WATER TEST OK
ALL CORRECTIONS HAVE BEEN MADE
OK FOR DRYWALL
NOTE: 1 RAIN LEADER ON WEST SIDE LOST ITS TEST
12/13/2000 PLUMBING - INTERMEDIATE Denied IVRS - Inspection 0999*
MUST USE SPECIALTY COUPLING WHERE ROOF DRAINS CONNECT TO ABS
RE TEST SYSTEM OK