Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T00CM00852
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2002 | PLUMBING - INTERMEDIATE | Approved | ||
| 06/25/2002 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*LEFT UTILITY CLEARANCE CARD FOR BLDG. C ONLY. | |
| 05/13/2002 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1.) RAIN LEADER WATER TEST FOR SOUTH A WING IS OK 2.) CLOSET RINGS HAVE BEEN SET IN SOUTH A WING 1ST & 2ND FL.3.) OVERHED WATER DISTRIBUTION IN MECH RM BLDG. C 1S OK. | |
| 04/23/2002 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK 2.) THIS INSPECTION IS FOR BLDG. A SOUTH 1ST FLOOR INTERMEDIATE 2ND FL ROUGH SOIL 3.) OVERHEAD WATER DISTRIBUTION IS OK. | |
| 04/23/2002 | PLUMBING - INTERMEDIATE | Partial Approval | BLDG C 4" TO 6" SDR 35. | |
| 04/15/2002 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1.) WASTE & VENT SYSTEM IS OK 2.) OVERHEAD WATER DISTRIBUTION IS OK 3.) OK FOR DRYWALL. 4.) THIS INSPECTION IS FOR BLDG. C NORTH ONLY. | |
| 04/11/2002 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999*1.) MUST HAVE A HANGER EVERY 4'-0" ON HORIZONTAL VENTS @ RESTROOM ON NORTH END OF BLDG. 2.) MUST USE A DIRECTIONAL FITTING WHEN EXTNDING A C.O. 3.) CAN NOT REDUCE TRAP ARM FROM 2" TO 1 1/2 FOR SINK IN DENTAL RM. | |
| 03/29/2002 | PLUMBING - INTERMEDIATE | Partial Approval | 1.) GAS PRESSURE TEST OF 60IBS FOR MED. PRESSURE GAS SYSTEM SOUTH C BLD ONLY IS OK 2.) RAIN LEADERS FOR NORTH C BLDG. IS OK. | |
| 03/27/2002 | PLUMBING - INTERMEDIATE | Partial Approval | 1.) WASTE & VENT SYSTEM OK 2.) OVERHEAD WATER DISTRIBUTION IS OK 3.) OK FOR DRYWALL. 4.) THIS INSPECTION IS FOR BLDG C SOUTH ONLY. | |
| 03/26/2002 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*OK FOR DRYWALL FOR SOUTH WALL DRYER. | |
| 03/22/2002 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* | |
| 03/15/2002 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1.) AIR PRESSURE TEST FOR 18" & 12" RAIN STORM DRAINS IS OK. 2.) FINAL CONNECTIONS TO RAIN LEADERS @ BLDG. A COURT YARD IS OK. | |
| 09/14/2001 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection 0000* | |
| 08/29/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1.) 2ND FLOOR BLDG. A WASTE & VENT SYSTEM IS OK 2.) OVERHEAD WATER DISTRIBUTION IS OK 3.) OK FOR DRYWALL. | |
| 08/28/2001 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999*STILL MISSING ISOLATOR IN WATER DISTRIBUTION CHECK SYSTEM 2.) HORIZONTAL VENT FOR SINKS @ FOYER A219 EAST SIDE MUST HAVE A HANGER EVERY 4'0" | |
| 08/24/2001 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999*1.) MISSING LOTS OF ISOLATORS ON WATER DISTRIBUTION IN PLBG WALLS 2.0 MUST REMOVE REPAIR COUPLING AND HARD PIPE NEW 2U WATER SERVICE DO NOT COVER. | |
| 08/09/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1.) WASTE & VENT SYSTEM IS OK FOR UNITS FROM COLUMN AF NORTH TO AA AND COLUMN #1 THRU 7 2.) OVERHEAD WATER DISTRIBUTION IS OK 3.) OK FOR DRYWALL UPON BLDG. INSPECTORS APPROVAL. | |
| 07/11/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1.) 1ST FLOOR BLDG. A SOIL WATER TEST OK 2.) RAIN LEADER WATER TEST IS OK 3.) OXECHEAD WATER DISTRIBUTION & WALLS ARE OK 4.) NOTE: CLOSET RINGS HAVE NOT BEEN SET @ THIS TIME. | |
| 07/09/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1.) SOIL WATER TEST OK FOR BLDG A 1ST FLOOR FROM COLUMN #AL TO AA NORTH AND FROM COLUMN #1 TO 8 WEST 2.) OVERHEAD WATER DISTRIBUTION AND HYDROSTATIC TEST 100 IBS IS OK. | |
| 06/20/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1)WASTE AND VENT SYSTEM ON BUILDING B SECOND FLOOR SOUTH END IS OK. 2)OK FOR DRYWALL UPON BUILDING INSPECTORS APPROVAL. |
|
| 06/19/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1)BUILDING B 2ND FLOOR SOUTH END FROM COLUMN #BK THEN #BP AND COLUMN #1 THRU #9 MUST HAVE OVERLOAD 2" VENTS HUNG EVERY 4'-0".2)RE VENTS HORIZONTAL MUST BE 42" AFF.3)NO OFFSETS ON PIETY ARMS. 4)OVERLOAD WATER DISRIBUTION OK FROM COLUMN A-B TO AL AND FROM COLUMN 1 THEN B. TEST 100 LBS OK, OK TO INSULATE. |
|
| 06/11/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1)WASTE AND VENT SYSTEM OK.2)OVERLOAD WATER DISTRIBUTION OK.3)OK FOR DRYWALL.4)THIS INSPECTION IS FOR BUILDING B 2ND FLOOR FROM COLUMN #BF TO BK AND FROM COLUMN #2 TO WEST #10. | |
| 06/05/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1)WASTE AND VENT SYSTEM OK.2)OVERLOAD WATER DISTRIBUTION OK.3)OK FOR DRYWALL UPON BUILDING INSPECTION APPROVAL. 4)NOTE:THIS INSPECTION IS FOR BUILDING #B 2ND FLOOR FROM COLUM #BF TO NORTH BA AND COLUM #1 THRU 9 ONLY.1)AIR PRESSURE TEST FOR SITE SEWER FOR MANHOLE AND P.L. LINE OK. |
|
| 05/18/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1)RAIN LEADER WATER TEST OK.2)THIS INSPECTION IS FOR BUILDING B CENTER WING WEST END OF BUILDING. | |
| 05/16/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* 1) 6" SITE SEWER FOR BLDG B FROM 6" CLAY MAIN TO BLDG DRAIN OK 2) AIR PRESSURE TEST OK 3) OK TO BACKFILL | |
| 05/11/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* 1) RAIN LEADER WATER TEST OK 2) THIS INSP IS FOR CENTER WING BLDG #B ONLY | |
| 05/10/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* 1) SOIL WATER TEST OK 2) OVER HEAD WATER DISTRUBUTION OK 3) THIS INSP. IS FOR BLDG B 1ST FLOOR FROM COLUMN #BN SOUTH TO #BP AND COLUMN LINE #1 THRU #3 OK ONLY 4) OK TO DRYWALL UPON BLDG INSP. APPROVAL 5) RAIN LEADER WATER TEST OK RAIN LEADERS OK FROM COLUMN LINE #1 TO 9 AND BK NORTH BA ONLY. NOTE: CENTER WING BLDG B NOT COMPLETE AT THIS TIME |
|
| 05/09/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* 1) RAIN LEADER WATER TEST OK FOR BLDG B FROM COLUMN #BD TO NORTH #BA AND COLUMN #1 TO WEST #9 ONLY. 2) NOTE: RAIN LEADERS IN ROOM #245, 246 HAS EXCEEDED 135 DEGREES HORIZONTAL RULE. RE TEST THESE RAIN LEADERS AFTER CORRECTIONS HAVE BEEN MADE | |
| 05/04/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* 1) SOIL WATER TEST OK 2) WATER DISTRIBUTION IN WALL OK 3) OK FOR DRYWALL UPON BLDG INSP OK 4) THIS INSP IS FOR UNITS BETWEEN COLUMN #BF TO SOUTH TO #BN AND WEST TO #10 |
|
| 05/03/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* | |
| 04/17/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000*1. ALL CORRECTIONS HAVE BEEN MADE FROM COLUMN # BF TO NORTH END OF BLDG. 2. OK FOR DRYWALL UPON BLDG INSPECTORS APPROVAL. | |
| 04/16/2001 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* 1) UNIT B-156 TOO MANY FIXTURES ON 1/2" CU 2) SUPPORT COLD VERTICAL PIPING IN WALLS WHERE NEEDED 3) OK TO START INSULATING OVER HEAD HOT FROM BF-NORTH | |
| 12/18/2000 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection 0000* RAIN LEADER WATER TEST OK ALL CORRECTIONS HAVE BEEN MADE OK FOR DRYWALL NOTE: 1 RAIN LEADER ON WEST SIDE LOST ITS TEST |
|
| 12/13/2000 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection 0999* MUST USE SPECIALTY COUPLING WHERE ROOF DRAINS CONNECT TO ABS RE TEST SYSTEM OK |