Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T00CM00852
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2002 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK 2.) THIS INSPECTION IS FOR BLDG. A 3.) OK TO BACKFILL TRENCH. | |
| 03/05/2002 | PLUMBING - ROUGH, SOIL | Partial Approval | 1.) SOIL WATER TEST IS OK 2.) THIS INSPECTION IS FOR ROUGH PLBG. FOR NORTH C BLDG. ONLY. | |
| 02/27/2002 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1.) AIR PRESSURE TEST FOR SOIL IS OK 2.) THIS INSPECTION IS FOR GREASE LINE ONLY IN KITCHEN 3.) OK TO BACKFILL TRENCH. | |
| 02/21/2002 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1.) SOIL WATER TEST IS OK 2.) THIS INSPECTION IS FOR KITCHEN AREA BLDG. C ONLY. 3.) OK TO BACKFILL TRENCH. | |
| 02/19/2002 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1.) AIR TEST 5LBS IS OK ALL OF ROUGH PLBG. IN BLDG C SOUTH EXCEPT THE KITCHEN. | |
| 02/15/2002 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*1.) AIR PRESSURE TEST OF 5LBS ON SOIL WASTE IS OK 2.) OK TO BACKFILL TRENCH. 3.) THIS INSPECTION IS FOR C BLDG. SOUTH LESS KITCHEN. | |
| 02/13/2002 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection 0000*NOT READY FOR INSPECTION. | |
| 12/11/2001 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection 0000*1.) HAD MEETING ON WORK TO BE DONE FOR TEMP LAUNDRY RM. | |
| 09/23/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*UNDERGROUND 1.) SOUTH EXTENSION BLDG. "A" 6" ABS BLDG DRAIN TO EXISTING OUTSIDE BLDG OK WATER TEST 4 RISERS 3, CLEAN OUTS. OK TO TIE-IN INSIDE AND OUTSIDE BLDG"A" OK FOR BACKFILL PAID BY CHECK #8853. | |
| 05/03/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* | |
| 04/19/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* 1) SOIL WATER TEST OK 2) THIS INSP. WAS FOR MECH ROOM ONLY 3) OK TO BACKFILL |
|
| 04/18/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* THIS INSPECTION IS FOR #AL NORTH TO A1 COLUMS ONLY OK TO BACKFILL TRENCH | |
| 04/12/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* 1) SOIL WATER TEST OK 2) THIS INSP. IS FOR ALL U.G. SOIL FROM NORTH END OF BLDG A TO COLUMN #AF 3) OK TO BACKFILL |
|
| 04/03/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* 1) FINAL CONNECTION FOR RAIN LEADERS AT SOUTH COURTYARD OK 2) OK TO BACKFILL TRENCH | |
| 03/05/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* 1) SOIL WATER TEST OK 2) THIS INSP. IS FOR TRUNK LINE ONLY FROM COLUMN #AL TO COLUMN #AA 3) OK TO BACKFILL TRENCH | |
| 03/01/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* 1) P.O.C OF RAIN LEADERS TO 6" SDR-45 OK 2) OK TO BACHFILL TRENCH 3) NOTE: THIS INSP WAS FOR NORTH COURT YARD OF BLDG B ONLY 4) APPROVED DRAINING SHOWS OVER FLOW RAIN HEADERS TO CONNECT TO 6" AND 12" STORM DRAINS. | |
| 02/26/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* OK TO BACKFILL THIS INSP IS FOR COLUMN BL TO BK | |
| 02/23/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*SOIL WATER TEST OK FROM COLUMN BN TO BL | |
| 02/21/2001 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection 0000* | |
| 02/05/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* SOIL WATER TEST OK C.W. AIR TEST STUBBED UP INTO BLDG OK OK TO BACKFILL TRENCH THIS INSPECTION IS FOR ROUGH SOIL FROM COLUMN BK TO BF ONLY |
|
| 01/25/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* | |
| 01/16/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* 1. PRE SLAB INSPECTION FOR PLUMBING OK |
|
| 01/11/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* SOIL WATER TEST OK THIS INSPECTION IS FOR COLUMN #BF TO BC AND CENTER WING FROM COLUMN #3 TO 10 OK TO BACKFILL TRENCH |
|
| 01/10/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* | |
| 01/08/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* SOIL WATER TEST OK THIS INSPECTION IS FOR ROUGH PLDG IN COLUMN #BC TO NORTH AND FROM 0 TO 3 OK TO BACKFILL TRENCH |
|
| 01/05/2001 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* SOIL WATER TEST OK THIS INSPECTION IS FOR NORTH WING FROM COLUMN #3 THRU #8 ONLY OK TO BACKFILL TRENCH |
|
| 01/04/2001 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection 0000* HAD MEETING WITH CONTRACTOR ON SITE SEWER ONLY |
|
| 12/20/2000 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* SOIL WATER TEST OK THIS INSPECTION IS FOR SOUTH WING OF BLDG B MAIN TRUNK LINE ONLY OK TO BACKFILL TRENCH |
|
| 12/11/2000 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* SOIL WATER TEST OK OK TO BACKFILL TRENCH THIS INSPECTION IS FOR UNDERGROUND SOIL TRUNK LINE UP TO COLUMN BK TO NORTH |
|
| 12/05/2000 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000* SOIL WATER TEST OK THIS INSPECTION WAS FOR UNDERGROUND TRUNK LINE ONLY NO BRANCHES FOR COLUMN LINE BF TO NORTH ONLY OK TO BACKFILL TRENCH |