Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T00BU00430

Parcel: 136088630

Inspection Status: Correction Required

Inspection History: FRAMING

Date Description Inspector Results Comments
02/24/2000 FRAMING Correction Required ADDTL COMMS - PARTIAL - PROVIDE 4-20d BOX NAILS PER STUD AT LEDGER. 30PSF(10/2) = 150 PLF AT LEDGER 30PSF(10/2) = 150 PLF AT LEDGER FRAME WALL APPEARS TO BE AT 24C.C. (2 FT. CC) 150 PLF X 2 C.C. = 3.65 NAILS. USE 4 NAILS PER STUD 82#
02/24/2000 FRAMING Partial Approval IVRS - Inspection 0000*
02/18/2000 FRAMING Correction Required ADDTL COMMS - 1. PROVIDE A JOIST HANGER OR H2.5 AT FLY RAFTERS TO LEDGER. 3. PROVIDE H2.5 AT NEX TO THE LAST RAFTER FROM THE WEST END AT THE BEAM. 4. EXPOSE THE FACE OF THE FOOTINGS. 5. PLANS CALL FOR 4X10 BEAM AND HAS BEEN CHANGED TO 4X8. WHO CHANGED THE PLANS?
02/18/2000 FRAMING Not ready for Inspection NOT READY FOR INSPECTION