Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 02/24/2000 |
FRAMING |
|
Correction Required |
ADDTL COMMS - PARTIAL - PROVIDE 4-20d BOX NAILS PER STUD AT LEDGER. 30PSF(10/2) = 150 PLF AT LEDGER 30PSF(10/2) = 150 PLF AT LEDGER FRAME WALL APPEARS TO BE AT 24C.C. (2 FT. CC) 150 PLF X 2 C.C. = 3.65 NAILS. USE 4 NAILS PER STUD 82# |
| 02/24/2000 |
FRAMING |
|
Partial Approval |
IVRS - Inspection 0000* |
| 02/18/2000 |
FRAMING |
|
Correction Required |
ADDTL COMMS - 1. PROVIDE A JOIST HANGER OR H2.5 AT FLY RAFTERS TO LEDGER. 3. PROVIDE H2.5 AT NEX TO THE LAST RAFTER FROM THE WEST END AT THE BEAM. 4. EXPOSE THE FACE OF THE FOOTINGS. 5. PLANS CALL FOR 4X10 BEAM AND HAS BEEN CHANGED TO 4X8. WHO CHANGED THE PLANS? |
| 02/18/2000 |
FRAMING |
|
Not ready for Inspection |
NOT READY FOR INSPECTION |