Case: S03-021

Parcel: 14101111C


Addresses:

10411 E BILBY RD


Inspection Status: Approved

Inspection History: ASSURANCE - DSD

Plan Number - S03-021

Inspection Description - ASSURANCE - DSD

Inspection Status - Approved

Date Description Inspector Results Comments
05/05/2020 ASSURANCE - DSD Approved
03/14/2019 ASSURANCE - DSD Partial Approval 1) THE SIDEWALKS HAVE BEEN CHECKED THROUGHOUT THE SITE AND MOST OF THE SIDEWALKS ARE IN GOOD CONDITION. I HAVE NOTED 4 AREAS ALONG THE NORTHSIDE OF PAINTED TURTLE LANE THAT WILL NEED SOME ADDITIONAL WORK. SINCE THIS PORTION OF THE SITE IS BEING RELEASED TO A DIFFERENT OWNER FOR ADDITIONAL WORK ON BLOCK 1, THIS DAMAGED SIDEWALKS WILL NEED TO BE REPAIRED BEFORE THE ASSURANCES CAN BE FULLY CLOSED. I WILL DISCUSS THESAE ITEMS WITH JOHN VANWINKLE TO SEE IF THIS IS ABLE TO BE DONE. 2) THE BASINS LOCATED ALONG STARLING DRIVE HAVE VEGETATION THAT WILL NEED TO BE ADDRESSED(CUT) TO PREVENT THE BASIN FROM OPERATING CORRECTLY
ALSO ALL OTHER INSPECTIONS FOR THIS SITE WILL NEED TO BE COMPLETED AND APPROVED PRIOR TO ME APPROVING DSD INSPECTION.
03/12/2019 ASSURANCE - DSD Partial Approval THE SITE HAS BEEN CHECKED FOR A FULL CLOSURE OF THE SUBDIVISION AND ASSURANCES. AT THIS TIME IT IS TOO WET TO INSPECT THE SIDEWALKS THROUGHOUT THE SITE, THIS WILL BE DONE TOMORROW WEATHER PERMITTING.
08/11/2005 ASSURANCE - DSD Partial Approval PARTIAL APPROVAL FOR LOTS #33, 37-42, 49-50. ALL OTHER LOTS WILL REQUIRE ADDITIONAL INSPECTIONS.
07/13/2005 ASSURANCE - DSD Approved INITIAL INSPECTION DENIED AT THIS TIME UNTIL THE PAVEMENT ON BILBY ROAD IS COMPLETE.
06/30/2005 ASSURANCE - DSD Approved INITIAL INSPECTION DENIE DUNTIL THE ROADWAY PIA WORK IS COMPLETE FOR BILBY. CALL FOR REINSPECTION WHEN ALL PAVING IS COMPLETE.