Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2024 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 12/19/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Will recall inspection on Thursday 12/21/23 | |
| 12/21/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | (TC Of O Level 4) (2)of the large water harvesting stations located at the South front of parking lot have all trees, cacti, and shrubs in place and landscape rock is in progress of being spread thru out. Inspection to be recalled when landscape rock is completed. A total of (17) Trees (116) Shrubs and (28) Cacti have been noted and accounted for. |