Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP22-0206

Parcel: 11612751B

Inspection Status: Partial Pass

Inspection History: SITE - Stormwater Setup and Controls

Date Description Inspector Results Comments
04/20/2023 SITE - Stormwater Setup and Controls Partial Pass EPSTEIN CONSTRUCTION THE CONTRACTOR FOR THIS SITE IS STARTING HIS OVER EXCAVATING TODAY FOR THE BUILDING PAD. NO CONCERNS AT THIS TIME. I WILL RESCHEDULE THIS SITE FOR A PRE-CON FOR TOMORROW TO MEET WITH BRIAN BENEDON
06/02/2023 SITE - Stormwater Setup and Controls Complete (Recurring) Track out protections in place
06/29/2023 SITE - Stormwater Setup and Controls Complete (Recurring) Track out protection and concrete containment. Inflation. No issues or concerns at this time.
07/19/2023 SITE - Stormwater Setup and Controls Partial Pass
09/20/2023 SITE - Stormwater Setup and Controls Partial Pass Provide controls as needed. Large material piles exist on site.
09/21/2023 SITE - Stormwater Setup and Controls Partial Pass Waddle installed
10/03/2023 SITE - Stormwater Setup and Controls Partial Pass
10/10/2023 SITE - Stormwater Setup and Controls Partial Pass
11/14/2023 SITE - Stormwater Setup and Controls Partial Pass
11/16/2023 SITE - Stormwater Setup and Controls Passed