Permit: DP22-0100

Parcel: 14041124E


Addresses:

3780 E VALENCIA RD


Inspection Status: Partial Pass

Inspection History: ENGR Grading Final

Permit Number - DP22-0100

Inspection Description - ENGR Grading Final

Inspection Status - Partial Pass

Date Description Inspector Results Comments
01/05/2024 ENGR Grading Final Partial Pass Complete all work as discussed during the site visit on 1/5/2024 Prior to calling for this inspection that will be scheduled for Monday, January 8, 2024
01/11/2024 ENGR Grading Final Partial Pass Ok for a Level 4 TCO,final not to be given till the minor drainage problems in the drainage way hav been addressed by the Engineer of Record
01/29/2024 ENGR Grading Final Not Ready 1st inspection here was completed on 1/8/24 and both basin at rear of property and drainage channel at north west corner were holding water 36 hrs after last rain. 3 days later during an inspection Dave Roberts did they were still holding water.

2nd inspection was done by myself here on the 23rd of January, 24 hours after a second rain and the same conditions existed both at 3780 and 6690 Alvernon. Came out on the 25th 48 hours had passed and still drainage was not evident in both locations.

3rd inspection the 29th of January and water has finally dried up 9 days later.

Contractor was notified that before final would be released that engineer on record would have to have a solution to remedy these issues on both properties.
02/10/2023 ENGR Grading Final Complete (Recurring) I meant contractor on site and Looked at various pipe runs of 18 inch 24 inch and 42 inch reinforced concrete pipe that they had placed this week. Contractors working currently on repairing floors labs to be poured and additional site work
05/22/2024 ENGR Grading Final Complete (Recurring)
05/23/2024 ENGR Grading Final Complete (Recurring)
05/28/2024 ENGR Grading Final Partial Pass This will be followed until basin repairs are completed. May 28th, operations are going as per plan. Ramp instal has been approved
05/29/2024 ENGR Grading Final Partial Pass Main basin work completed on May 29th, 2024
06/17/2024 ENGR Grading Final Partial Pass
06/18/2024 ENGR Grading Final Partial Pass
06/24/2024 ENGR Grading Final Passed
07/25/2023 ENGR Grading Final Partial Pass Grading for the parking lot and the entryways
08/22/2023 ENGR Grading Final Partial Pass Due to the rains of last night contractors is not doing any grading today
09/20/2023 ENGR Grading Final Partial Pass contractors Grading South of rodeo wash for the parking area
10/19/2023 ENGR Grading Final Partial Pass
10/25/2023 ENGR Grading Final Not Ready Minor grade work still needs to be done on a few areas of sidewalk and Alveron entry to site.
11/22/2023 ENGR Grading Final Partial Pass Sidewalk concrete replacement forNorth and West sections of building 3610 is still in progress
12/14/2023 ENGR Grading Final Not Ready Southside of site:
1) Minor areas through the site graded poorly and hydro seed has not been applied in a consistent manner.
2) The Mason located in the south east quadrant of the southside is showing signs of sediment being retained on the bottom and there’s erosion noted at the inlet structure.
3) The grading along the northern side of the south berm south of the parking lot has not been graded completely in all areas will verify with the plans the grading process that was required. Also hydroseeding has either not been applied in some locations, or is very sporadic along the southern boundaries.
4) Minor stockpiles DG has been noted along the south boundaries on the berm and also there are areas where loose material has been pushed over the berm into the wash. This will all need to be removed prior to final inspection.
5) Along the south side burn Maria, all the silt fence has not been completely removed. Construction staking hasn’t been completely removed construction rope that was utilized to mark the areas to save the plants have not been removed. All this needs to be done prior to reinspection and hydroseeding needs to be applied were none has been applied at this time.
6) The Southern parking lot needs to be clean and clear remove all excess material that has been placed on the pavement and then check that all dropping let structures are free and clear of access all the materials. These will be inspected on the next visit.
7) The trash enclosures for this site has been completed incorrectly. They are all missing the bollards on the sides of the trash enclosure 5 foot from the front wall recess back into the structure.
8) Then accessible signs at the north west corner of this site have not been installed underneath the parking signs for handicap