Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
Permit Number - DP22-0100
Inspection Description - PDSD Site/Engineering Division - Landscaping
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/20/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | Contractor just started planting the trees and shrubbery on the Valencia side of the building | |
10/19/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Contractor still missing a few trees, and the trees that are in need to be staked and the bamboo staking needs to be removed | |
10/23/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | contractor still needs to install missing trees and plants | |
11/22/2023 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Need to verify landscape in median areas of North parking lot. | |
12/12/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
12/19/2022 | PDSD Site/Engineering Division - Landscaping | Complete (Recurring) | crews are working on rough grading the full site north of the drainage channel south of Valencia and will continue to do this for the next few weeks. I’ve asked them to make sure they call this inspection in every two weeks till they have placed pavement for all their parking areas. The nursery has been set for all the removed plants from the site but has not been inspected at this time. |