Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Complete (Recurring)
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/16/2023 |
ENGR Engineering Final
|
|
Complete (Recurring) |
They called in for a re-bar inspection for trash enclosures the footer it’s good to be poured. |
| 02/24/2023 |
ENGR Engineering Final
|
|
Partial Pass |
pre grout |
| 03/07/2023 |
ENGR Engineering Final
|
|
Complete (Recurring) |
Contractor called in for a rebar inspection for the floor for the trash enclosure it’s not ready at this time had me look at the holes for the bollards. |
| 03/09/2023 |
ENGR Engineering Final
|
|
Complete (Recurring) |
Install the rebar for trash enclosure floor good at this time |
| 04/06/2023 |
ENGR Engineering Final
|
|
Partial Pass |
We’ll give them a final when they install the handicap parking signs |
| 04/19/2023 |
ENGR Engineering Final
|
|
Passed |
|