Address: 3355 S 6TH AV
Date - 12/06/2025 8:18 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-56-29 Southside 1650 2687

Special Development Requests & Requirements

Address: 3355 S 6TH AV
Date - 12/06/2025 8:18 a.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
H000013783 CLOSED 02/17/2022 N/A Historical Information

Permits

Address: 3355 S 6TH AV
Date - 12/06/2025 8:18 a.m.
Total Number Of Permits - (18)
Permit Status Apply Date Expired Date Unit Type Description
TR-UTL-1125-02008 In Review 11/24/2025 N/A Right-of-Way (ROW) - Utility The Tucson Police Department (TPD), partnered with Axon, will be using Bluewater Telecommunications to install solar-powered license plate readers (LPR)/live video cameras on 22 streetlight poles around the city. DTM, Blake Richards, is aware of this project. The locations provided are the properties in which the light poles are closest to . Please reach out before rejecting permit for any additional information. 520-484-4410.
TF-FCP-1122-00108 Complete 11/16/2022 N/A Fire Construction Permit relocating 54 sprinkler heads on a existing system
TF-FCP-1125-00962 Issued 11/10/2025 05/24/2026 Fire Construction Permit remove and replace 4 Dry Pendent Sprinklers within cooler and adjust branchlines that are on Roof of Cooler to facilitate in the replacement of cooler roof.
TS-PRM-1023-00549 Issued 10/06/2023 04/03/2024 Sign - Permanent Change of copy on existing double faced pole sign
TC-COM-0925-01652 Inspections 09/10/2025 03/30/2026 Commercial Building Installation of electric vehicle charging station
TC-CFO-0423-00052 Issued 04/06/2023 06/06/2023 Certificate of Occupancy Partial occupancy for Office space ONLY
TF-FCP-0323-00515 Complete 03/27/2023 N/A Fire Construction Permit New Kitchen Suppression System Install
T22CM02153 Complete 03/23/2022 12/17/2023 Commercial Building TI: Office Remodel
TR-UTL-0225-00344 Complete 02/26/2025 09/29/2025 Right-of-Way (ROW) - Utility PRJ287123-1: Cox to pull 945' through existing conduit, trench 11' and bore 645' to install CATV conduit and place vaults for system tie. Permit update 6/25/2025: Permit renewed for 90 days as of 7/1/2025.
DP22-0017 Complete 02/08/2022 04/18/2026 Development Package Site - Mobile Meals. Building and parking addition to existing site.
TF-FCP-0123-00339 Complete 01/27/2023 N/A Fire Construction Permit Installation of dedicated sprinkler monitoring system.
T01BU03468 FINAL 12/11/2001 06/25/2002 SPKLR FIRE SPKR:ADD 4
T01CM02276 CLOSED 05/11/2001 02/15/2010 COMBO TI:RESTAURANT
T02BU00329 FINAL 02/01/2002 10/21/2002 SPKLR FIRE SPKR:RELOCATE 2
T07AN00425 ISSUED 05/17/2007 N/A ADDRNEW
T09BU01051 WITHDRWN 07/16/2009 N/A WALL/FEN WALL:TRASH ENCLOSURE 74 LF X 6' HIGH
T09CM01977 FINAL 07/23/2009 02/02/2010 COMBO SITE
T19RW01260 FINAL 03/08/2019 04/14/2019 ROW Obtaining seven (7) asphalt cores along 6th Avenue. Locations are show on the accompanying map. All cores are 4'' diameter through existing pavement. Borings up to 2'' below existing pavement. Tucson Pavement Rehabilitation FY20 Package 1

Plans

Address: 3355 S 6TH AV
Date - 12/06/2025 8:18 a.m.
Total Number Of Plans - (1)
Plan Number Status Application Date Exp Date Unit Type Description
TD-DIV-0525-00060 Awaiting Customer Attention 05/06/2025 N/A -- Land Split/Lot Split Split off the parcel (Lot 3) that had been combined before. AKA Restoring the parcel configuration to what it was before.

Record Requests

Address: 3355 S 6TH AV
Date - 12/06/2025 8:18 a.m.
Total Number Of Requests - (4)
Request Number Status Request Date Completed Date Type Description
REQ-0523-02558 Complete 05/05/2023 05/05/2023 Requests Partial occupancy for Office space ONLY
REQ-0623-03388 Complete 06/20/2023 06/20/2023 Requests TI: Office Remodel
REQ-0625-03892 Denied 06/09/2025 N/A Requests 90 day extension - PRJ287123-1: Cox to pull 945' through existing conduit, trench 11' and bore 645' to install CATV conduit and place vaults for system tie.
REQ-0625-04185 Approved 06/24/2025 06/25/2025 Requests 90 Day Extension -PRJ287123-1: Cox to pull 945' through existing conduit, trench 11' and bore 645' to install CATV conduit and place vaults for system tie.