Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | PDSD Engineering Division Pre-Construction SITE | Not Ready | ||
| 01/27/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Super will be emailing me today the NOI, It is still current CGP 2025 has been issued. Tentative plat has been approved/issued. NPPO will be revised and submitted-plants no longer exist. Old SWPPP Board is on Fence and SWPPP book included. This will be updated. SWPPP plan will revised and Submitted for 2025 CGP Contractors okay to install BMPs for and will Request storm water initial when ready. |
|
| 09/05/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 11/21/2023 | PDSD Engineering Division Pre-Construction SITE | Not Ready | no construction |