Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
|
| 02/02/2026 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
The waddles are in place. The V ditches are cut in and all the track out rock in place. |
| 06/29/2026 |
SITE - Stormwater Setup and Controls |
|
Passed |
Keep dirt and sediment on site and off roads. If there’s any dirt in the road, it must be swept up promptly. If this becomes a problem, trackout will have to be placed at entrances again. |
| 11/21/2023 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
no construction |