Permit: DP21-0218

Parcel: 13316030C

Inspection Status: Not Ready

Inspection History: SITE - Stormwater Follow-up

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Follow-up Not Ready
01/09/2024 SITE - Stormwater Follow-up Partial Pass small amounts of “track out” observed on northeast portion of site next to car wash. wattles not maintained.
01/10/2024 SITE - Stormwater Follow-up Partial Pass visited site 01/09/24, no changes, small amounts of “track out” observed on northeast portion of site next to car wash. wattles not maintained (same comments as before).
05/30/2024 SITE - Stormwater Follow-up Passed
08/11/2023 SITE - Stormwater Follow-up Complete (Recurring) nNO CONCERNS AT THIS TIME
08/16/2023 SITE - Stormwater Follow-up Partial Pass no concerns at this time. project super provided installation images that have been forwarded to d. roberts.
10/12/2023 SITE - Stormwater Follow-up Partial Pass storm water inlet grate needs protection, wattles or sandbags, soil is migrating into grate at time of inspection . water in inlet, assume tanks are full, if so pump. all soil stockpiles need wattles as none present.
12/08/2023 SITE - Stormwater Follow-up Partial Pass