Inspection Status: Not Ready
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Follow-up
|
|
Not Ready |
|
| 01/09/2024 |
SITE - Stormwater Follow-up
|
|
Partial Pass |
small amounts of “track out” observed on northeast portion of site next to car wash. wattles not maintained. |
| 01/10/2024 |
SITE - Stormwater Follow-up
|
|
Partial Pass |
visited site 01/09/24, no changes, small amounts of “track out” observed on northeast portion of site next to car wash. wattles not maintained (same comments as before). |
| 05/30/2024 |
SITE - Stormwater Follow-up
|
|
Passed |
|
| 08/11/2023 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
nNO CONCERNS AT THIS TIME |
| 08/16/2023 |
SITE - Stormwater Follow-up
|
|
Partial Pass |
no concerns at this time. project super provided installation images that have been forwarded to d. roberts. |
| 10/12/2023 |
SITE - Stormwater Follow-up
|
|
Partial Pass |
storm water inlet grate needs protection, wattles or sandbags, soil is migrating into grate at time of inspection . water in inlet, assume tanks are full, if so pump. all soil stockpiles need wattles as none present. |
| 12/08/2023 |
SITE - Stormwater Follow-up
|
|
Partial Pass |
|