Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP21-0147
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/30/2022 | ENGR Grading Final | BBENEDON | Approved | Entered by NGARCIA3 - approve. Trash enclosure and menu board signage. |
08/18/2022 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by VVERA1 - IS PARTIALLY APPROVED FOR THE POURING OF THE TRASH ENCLOSURE FLOORS AFTER ADDITIONAL SUPPORT BLOCKS HAVE BEEN ADDED THROUGHOUT |
02/22/2022 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by VVERA1 - IS PARTIAL, OK TO POUR THE TRASH ENCLOSURE FOOTER |
09/19/2022 | ENGR Grading Final | MERNANDEZ | Approved | Entered by VVERA1 - APPROVED |
09/12/2022 | ENGR Grading Final | MHERNANDEZ | Partial Approval | Entered by NGARCIA3 - PARTIAL |
08/30/2022 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by NGARCIA3 - Partially approved. Graded. Ensure 6 inches at recessed landscape area. |
07/07/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Final grading, curbs and sidewalk installations |
06/22/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Little activity on site. Temporary fencing and barricades still in place. |
06/07/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Grading and curb installations. |
06/01/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - continued grading |
03/25/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Pad buildup and curb installation. No progress from last rebar inspection |
03/11/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - 09185. Continued. Rough grading and curb installation. Large material piles on site. Stormwater controls in place. No address posted. Temporary fencing installed |
01/28/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by VVERA1 - CONTINUED. CREW IS WORKING ON FORMING FOR THE FLOOR SLAB, SOME CURBS HAVE BEEN POURED AT THIS TIME ON THE EAST SIDE OF THE PROJECT. |
09/27/2022 | ENGR Grading Final | BBENEDON | Approved | Entered by NGARCIA3 - Approved |
09/28/2022 | ENGR Grading Final | BBENEDOON | Approved | Entered by VVERA1 - Approved |
03/02/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. .51 acre Starbucks requiring to Van accessible spaces and two each bike spaces. No address posted at this time. Please provide contact information and schedule all required inspections. Caldwell construction |