Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/30/2022 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by NGARCIA3 - approve. Trash enclosure and menu board signage.
|
| 08/18/2022 |
ENGR Grading Final |
DROBERTS |
Partial Approval |
Entered by VVERA1 - IS PARTIALLY APPROVED FOR THE POURING OF THE TRASH ENCLOSURE FLOORS AFTER ADDITIONAL SUPPORT BLOCKS HAVE BEEN ADDED THROUGHOUT |
| 02/22/2022 |
ENGR Grading Final |
DROBERTS |
Partial Approval |
Entered by VVERA1 - IS PARTIAL, OK TO POUR THE TRASH ENCLOSURE FOOTER |
| 09/19/2022 |
ENGR Grading Final |
MERNANDEZ |
Approved |
Entered by VVERA1 - APPROVED |
| 09/12/2022 |
ENGR Grading Final |
MHERNANDEZ |
Partial Approval |
Entered by NGARCIA3 - PARTIAL |
| 08/30/2022 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Graded. Ensure 6 inches at recessed landscape area. |
| 07/07/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Final grading, curbs and sidewalk installations |
| 06/22/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Little activity on site. Temporary fencing and barricades still in place. |
| 06/07/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Grading and curb installations. |
| 06/01/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - continued grading |
| 03/25/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Pad buildup and curb installation. No progress from last rebar inspection |
| 03/11/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - 09185. Continued. Rough grading and curb installation. Large material piles on site. Stormwater controls in place. No address posted. Temporary fencing installed |
| 01/28/2022 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by VVERA1 - CONTINUED. CREW IS WORKING ON FORMING FOR THE FLOOR SLAB, SOME CURBS HAVE BEEN POURED AT THIS TIME ON THE EAST SIDE OF THE PROJECT. |
| 09/27/2022 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by NGARCIA3 - Approved |
| 09/28/2022 |
ENGR Grading Final |
BBENEDOON |
Approved |
Entered by VVERA1 - Approved |
| 03/02/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. .51 acre Starbucks requiring to Van accessible spaces and two each bike spaces. No address posted at this time. Please provide contact information and schedule all required inspections. Caldwell construction |