Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/28/2022 |
ENGR Engineering Final
|
BBENEDOON |
Approved |
Entered by VVERA1 - Approved |
| 09/27/2022 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Complete all remaining work and corrections as previously noted. |
| 09/12/2022 |
ENGR Engineering Final
|
MHERNANDEZ |
Continued |
Entered by NGARCIA3 - CN / LANDSCAPE IS NOT COMPLETED NEED TO COMPLETE THE RIPRAP AND INSTALL THE PLANTS AND D.G.
|
| 08/30/2022 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by NGARCIA3 - not ready. Joe with Caldwel Watza construction. 5204513574 |
| 09/28/2022 |
ENGR Engineering Final
|
BBENEDOON |
Approved |
Entered by VVERA1 - Approved |
| 09/27/2022 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Complete all remaining work and corrections as previously noted. |
| 09/19/2022 |
ENGR Engineering Final
|
MERNANDEZ |
Partial Approval |
Entered by VVERA1 - PARTIAL NEED TO COMPLETE LANDSCAPE. |
| 09/13/2022 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Engineering has no issues it would prevent a temporary certificate of occupancy. |
| 09/12/2022 |
ENGR Engineering Final
|
MHERNANDEZ |
Partial Approval |
Entered by NGARCIA3 - PARTIAL |
| 08/30/2022 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by NGARCIA3 - not ready. Joe with Caldwel Watza construction. 5204513574 |