Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | SITE - Stormwater Setup and Controls | Not Ready | ||
| 03/01/2024 | SITE - Stormwater Setup and Controls | Complete (Recurring) | All setup and controls are in place, no concerns at this time. | |
| 08/06/2024 | SITE - Stormwater Setup and Controls | Complete (Recurring) | 1) Valley drain must be removed and replaced as per plan. No exceptions for this terrible work. 2) RCP storm drain across entrench must be replaced and inspected as it is going in, excavation, bedding, partial backfill, final backfill. 3) Basin must be finished. |