Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP21-0034
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
02/15/2024 | ENGR Grading Final | Partial Pass | Site work grading is in progress and water line located on West end of site is in progress. Walked entire perimeter of site and all set up and controls are in place with no concerns at this time. |
|
03/01/2024 | ENGR Grading Final | Partial Pass | Grading continues thru out site,water main line work continues on North and NW corner sections of site and along South side of Old Vail Rd. | |
03/15/2024 | ENGR Grading Final | Partial Pass | Grading continues thru out site, water line located on West side of site has been backfilled, no concerns at this time. | |
04/12/2024 | ENGR Grading Final | Not Ready | The contractor has started to grade the site for the parking lot and the future placement of asphalt for all parking areas. There is a new stock pile that is located on the west side of the property that is not shown on any of the plans and will be required to have a stockpile permit for it if it is to remain. There is a retention basin noted at the north west corner of the site and on the adjacent property that needs to be completed. | |
05/10/2024 | ENGR Grading Final | Not Ready | I drove out to look at the site to see what work has been completed. No one on site at this time it is 1:39 in the afternoon. Currently the site has been graded roughly throughout the redemption retention. Detention basin has been roughly graded, but no other work has been done. It appears that the site has been set for ABC grades probably started this next week. Also, on the sewer line has been laid from Valencia south end of this site. Two manholes have been constructed, but not backfilled. Also, on the south side of the site, two concrete pipes have been placed across what appears to be the future new Rodeway Inn moderately backfilled in one location to allow for traffic. This inspection will need to be rescheduled at a later date when somebody will be available on site to answer all questions | |
06/12/2024 | ENGR Grading Final | Partial Pass | Contractor poured 108 feet of valley gutter yesterday. Today they need to remove 28 feet of valley gutter because the concrete settle too fast on them yesterday this morning contractors gonna pour 80 lineal feet of valley gutter. | |
06/12/2024 | ENGR Grading Final | Partial Pass | Contractor poured 108 feet of valley gutter yesterday. Today they need to remove 28 feet of valley gutter because the concrete settle too fast on them yesterday this morning contractors gonna pour 80 lineal feet of valley gutter. | |
06/13/2024 | ENGR Grading Final | Partial Pass | Contractor form and going to pour today 120 lineal feet of valley gutter. Removed 28 feet of valley gutter that got away from the other day. | |
06/17/2024 | ENGR Grading Final | Partial Pass | meet out here with a Contractor inform me that the valley gutter is cracking throughout in different areas. The percentage of the valley gutter is a NONCOMPLIANT contractor will re-compact the grade before pouring and have it tested by third-party contractor will call in for a reinspection after completion. | |
08/13/2024 | ENGR Grading Final | Complete (Recurring) | Storm water pipe at entrance passed | |
08/19/2024 | ENGR Grading Final | Partial Pass | Storm water pipe passed. Grade for culvert has partially passed and will be looked at again on the 20th of August. | |
08/20/2024 | ENGR Grading Final | Partial Pass | Storm water pipe passed. Grade for culvert has partially passed and will be looked at again on the 20th of August. 20th of August, 2nd part of valley, poured approximately 200' on the right side of the valley gutter and looks good. | |
08/23/2024 | ENGR Grading Final | Partial Pass | Aug, 23rd sub grade on the second part of the valley drain looks good. | |
09/09/2024 | ENGR Grading Final | Passed | ||
09/17/2024 | ENGR Grading Final | Passed | All grading items have been completed including the basin area. 9/17/24 | |
10/03/2024 | ENGR Grading Final | Passed |