Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - NPPO
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
PDSD Site/Engineering Division - NPPO |
|
Not Ready |
|
| 01/18/2024 |
PDSD Site/Engineering Division - NPPO |
|
Not Ready |
We use this meeting today for a preconstruction meeting and NPPO. Contractor will start grabbing and grading on Monday. Inform the contractor to call Ian for inspections every two weeks. |
| 02/02/2024 |
PDSD Site/Engineering Division - NPPO |
|
Partial Pass |
Viewed (26) barrel cactus (4) paloverde trees (1) hack tree transplanted in the final designated areas per approved plan located at the South Front of site off of Old Vail Rd. |
| 02/15/2024 |
PDSD Site/Engineering Division - NPPO |
|
Passed |
|
| 09/09/2024 |
PDSD Site/Engineering Division - NPPO |
|
Passed |
|