Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
|
| 01/23/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Inform the contractor you need to call him inspections for stormwater follow up every two weeks and a place all the wattles along the fence line and the city is requiring density test |
| 11/15/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
|