Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP20-0214
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/20/2022 | ENGR Engineering Final | BBENEDON | Denied | Entered by NGARCIA3 - Denied. Accessible walkway at rear of building exceeds the maximum allowable cross slope as noted on the approved plans, as previously noted. Accessible route from the street to the building is not installed as shown on approved construction drawings. Temporary fencing is still in place and is locked. No one on site. No contact information provided. |
09/01/2022 | ENGR Engineering Final | BBENEDON | Denied | Entered by NGARCIA3 - Denied. Previously noted corrections have not been made. Also, note minor change of accessible walkway layout. Not as shown per plan. |
07/28/2022 | ENGR Engineering Final | BBENEDON | Denied | Entered by NGARCIA3 - Denied. Correct slope of walkway from rear of building to main walkway prior to continuing with main walkway. Conversation with Francisco concrete contractor. |
06/29/2022 | ENGR Engineering Final | BBENEDON | Denied | Entered by VVERA1 - Denied. Landing and walkway at rear of building exceed 2% slope specified on plan. Accessible walkway to and from building has not yet been installed. Billing is still under construction. |