Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 10/22/2021 |
SITE - Stormwater Follow-up
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 07/02/2021 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by VLEON1 - CONTINUED NO CONCERNS AT THIS TIME |
| 06/10/2021 |
SITE - Stormwater Follow-up
|
MHERNANDEZ |
Continued |
Entered by VLEON1 - |
| 05/28/2021 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by VLEON1 - NO CONCERNS AT THIS TIME, STORMWATER CONTROLS APPEAR TO BE WORKING AS NEEDED.
REMEMBER TO MONITOR ALL OPEN SITES AT ALL TIMES TO ENSURE THAT BLOWING DUST IS KEPT TO A BARE MINIMUM, BLOWING DUST IS A CITABLE OFFENSE OFFENSE BY THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY AND MAY ALSO CAUSE A SHUTDOWN OF A SITE. |
| 05/17/2021 |
SITE - Stormwater Follow-up
|
MHERNANDEZ |
Continued |
Entered by VLEON1 - CN AND RESCHEDULE FOR TRASH BIN APRON.
|
| 05/11/2021 |
SITE - Stormwater Follow-up
|
MHERNANDEZ |
Continued |
Entered by VLEON1 - |
| 03/30/2021 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by RSALDAT1 - CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THIS INSPECTION |
| 03/19/2021 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by VLEON1 - CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THIS INSPECTION.
|
| 03/11/2021 |
SITE - Stormwater Follow-up
|
MHERNANDEZ |
Continued |
Entered by VLEON1 - CONTINUE. BACKFILL THE STORM WATER PIPE WITH BEDDING SAND AND NATIVE MATERIAL. ON THE EAST SIDE OF THE PROJECT. |
| 03/05/2021 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by RSALDAT1 - CONTINUED, NO CONCERNS NOTED AT THIS TIME. |
| 02/25/2021 |
SITE - Stormwater Follow-up
|
MHERNANDEZ |
Continued |
Entered by VLEON1 - CONTINUE |
| 02/24/2021 |
SITE - Stormwater Follow-up
|
MHERNANDEZ |
Continued |
Entered by VLEON1 - CONTINUE THE CONTRACTOR HAVE A CATCH BASIN THAT THE DETAIL CALL FOR NO STEEL .MARICOPA DETAILS. CONTRACTOR IS GOING TO POUR THANCATCH BASIN TODAY .BUT IF NEED THEY AGREED TO REMOVE IT.
|
| 02/23/2021 |
SITE - Stormwater Follow-up
|
MHERNANDEZ |
Continued |
Entered by VLEON1 - CN. CONTRACTOR IS REMOVING THE MATERIAL OVER THE 18 PIPE . THE BEDDING MATERIAL IS NON-COMPLIANCE WITH THW CITY. |
| 02/22/2021 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by VLEON1 - CONTINUED, NO CONCERNS NOTED DURING THIS INSPECTION AT THIS TIME |