Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP20-0104
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
06/28/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7073 S PLUMER AV/WIRE MESH AND DOWELS FOR THE BUILDING TO THE NORTH FLOOR PATIO. |
06/23/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7075 S PLUMER AV REBAR FOR LIGHT FOUNDATION. |
06/23/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7073 S PLUMER AV REBAR FOR LIGHT FOUNDATION. |
06/22/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - WILL RESCHEDULE FOR TOMORROW |
06/22/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE WILL RESCHEDULE TOMORROW |
06/22/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE RESCHEDULE FOR TOMORROW |
06/22/2021 | ENGR Grading Final | WGALLAGHER | Approved | Entered by VLEON1 - |
06/18/2021 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by VLEON1 - PARTIAL AT THIS TIME FOR AN AREA OF SLAB ON GRADE LOCATED AT THE NORTHEAST CORNER OF THE SOUTH OF BUILDING #. PHOTOS WILL BE PROVIDED BY THE CONTRACTOR LATER TODAY OF TODAYS SITE CONDITIONS. THE ARE ABLE TO PLACE CONCRETE NEXT WEEK AT THIS LOCATION. |
06/18/2021 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by VLEON1 - PARTIAL AT THIS TIME FOR AN AREA OF SLAB ON GRADE LOCATED AT THE NORTHEAST CORNER OF THE SOUTH OF BUILDING #. PHOTOS WILL BE PROVIDED BY THE CONTRACTOR LATER TODAY OF TODAYS SITE CONDITIONS. THE ARE ABLE TO PLACE CONCRETE NEXT WEEK AT THIS LOCATION. |
06/18/2021 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by VLEON1 - ARTIAL AT THIS TIME FOR AN AREA OF SLAB ON GRADE LOCATED AT THE NORTHEAST CORNER OF THE SOUTH OF BUILDING #. PHOTOS WILL BE PROVIDED BY THE CONTRACTOR LATER TODAY OF TODAYS SITE CONDITIONS. THE ARE ABLE TO PLACE CONCRETE NEXT WEEK AT THIS LOCATION. |
06/04/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7075 S PLUMER AV /TYING REBAR FOR THE FUEL TANK FLOOR |
06/04/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7073 S PLUMER AV /TYING REBAR FOR THE FUEL TANK FLOOR |
06/04/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7010 S PLUMER AV /TYING REBAR FOR THE FUEL TANK FLOOR |
06/02/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7075 S PLUMER AV/ REBAR INSPECTION FOR TWO BUILDING FLOOR. |
06/02/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7073 S PLUMER AV/ REBAR INSPECTION FOR TWO BUILDING FLOOR. |
05/26/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7075 S PLUMER AV - DAVID ROBERTS HAD ME LOOK AT THE ELECTRICAL TRENCH AND CONDUIT 2010 CN |
05/26/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7073 S PLUMER AV - DAVID ROBERTS HAD ME LOOK AT THE ELECTRICAL TRENCH AND CONDUIT 2010 CN |
05/26/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7010 S PLUMER AV - DAVID ROBERTS HAD ME LOOK AT THE ELECTRICAL TRENCH AND CONDUIT 2010 CN |
04/30/2021 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by VLEON1 - PARTIAL FOR 7075 S PLUMER AV AT THIS TIME, NO WORK BEING PERFORMED UNDER THIS ITEM AT THIS TIME. |
04/30/2021 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by VLEON1 - PARTIAL FOR 7073 S PLUMER AV AT THIS TIME, NO WORK BEING PERFORMED UNDER THIS ITEM AT THIS TIME. |
04/30/2021 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by VLEON1 - PARTIAL FOR 7010 S PLUMER AV AT THIS TIME, NO WORK BEING PERFORMED UNDER THIS ITEM AT THIS TIME. |
04/02/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN LIGHT POLE FOUNDATION ON THE WEST SIDE OF THE PARKING LOT AND ONE ON THE SOUTHEAST. |
04/02/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN LIGHT POLE FOUNDATION ON THE WEST SIDE OF THE PARKING LOT AND ONE ON THE SOUTHEAST. |
04/02/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN LIGHT POLE FOUNDATION ON THE WEST SIDE OF THE PARKING LOT AND ONE ON THE SOUTHEAST. |
03/17/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN, LOOKING AT THE CONDUIT ENCASEMENT.CONTINUE |
03/17/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7073 S PLUMBER AV, LOOKING AT THE CONDUIT ENCASEMENT.CONTINUE |
03/17/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN, LOOKING AT THE CONDUIT ENCASEMENT.CONTINUE. |
03/05/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED FOR 7075 S PLUMER AV AT THIS TIME, THE INSPECTION THEY NEEDED WAS TO BE COMPLETED BY THE BUILDING INSPECTOR DAVID MUNIZ. |
03/05/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED FOR 7073 S PLUMER AV AT THIS TIME, THE INSPECTION THEY NEEDED WAS TO BE COMPLETED BY THE BUILDING INSPECTOR DAVID MUNIZ. |
03/05/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED AT THIS TIME, THE INSPECTION THEY NEEDED WAS TO BE COMPLETED BY THE BUILDING INSPECTOR DAVID MUNIZ. |
02/22/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 7075 S PLUMER AV - REBAR FOR FLOOR FOR TANK #3 AND FOR THE ELECTRICAL CONDUIT ENCASEMENT |
02/22/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 7073 S PLUMER AVE - REBAR FOR FLOOR FOR TANK #3 AND FOR THE ELECTRICAL CONDUIT ENCASEMENT |
02/22/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 7010 S PLUMER AVE - REBAR FOR FLOOR FOR TANK #3 AND FOR THE ELECTICAL CONDUIT ENCASEMENT |
02/19/2021 | ENGR Grading Final | IVR USER | Cancelled | Entered by IVR USER - IVRS - RI canceled |
08/05/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - MET WITH THE CONTRACTOR AND LOOKED AT THE BACKFILL OF THE PIPES AND CATCH BASINS ON THE NORTH SIDE OF THE TANKS. |
06/16/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 7010 S PLUMER AV |
06/15/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7075 S PLUMER AV - THEY CALL IN FOR TUCSON WATER TO INSPECT A COPPER LINE FROM ONE BUILDING TO ANOTHER. |
06/15/2021 | ENGR Grading Final | MHERNANDEZ | Cancelled | Entered by VLEON1 - CN FOR 7073 S PLUMER AV THEY CALL IN FOR TUCSON WATER TO INSPECT A COPPER LINE FROM ONE BUILDING TO ANOTHER. |
06/15/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN 700 S PLUMER AV THEY CALL IN FOR TUCSON WATER TO INSPECT A COPPER LINE FROM ONE BUILDING TO ANOTHER. |
04/30/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - FOR 7010 S PLUMER AV - GENERAL WORK ON VARIOUS ENGINEERING ITEMS THROUGHOUT OUT THIS SITE, ALSO A SECOND CREW IS WORKIN ON THE NORTHERN PARKING LOT PREPARING THE SUBGRADE AND ABC GRADE FOR THE FUTURE AC PLACEMENT NEXT WEEK. |
04/23/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED FOR 7075 S PLUMER AV, CREWS WORKING ON GRADING IN THE PARKING LOT NORTH SIDE OF SITE, AND POURING FOUNDATIONS WITHIN THE FUEL AREA. THE SLURRY BACKFILL OVER THE PIPES HAS BEEN PLACED OVER THE PIPES LOCATED AT THE NORTHWEST QUADRANT OF THE FUEL AREA. |
04/23/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED FOR 7073 S PLUMER AV, CREWS WORKING ON GRADING IN THE PARKING LOT NORTH SIDE OF SITE, AND POURING FOUNDATIONS WITHIN THE FUEL AREA. THE SLURRY BACKFILL OVER THE PIPES HAS BEEN PLACED OVER THE PIPES LOCATED AT THE NORTHWEST QUADRANT OF THE FUEL AREA. |
04/23/2021 | ENGR Grading Final | DROBERTS | Cancelled | Entered by VLEON1 - CONTINUED FOR 7010 S PLUMER AV, CREWS WORKING ON GRADING IN THE PARKING LOT NORTH SIDE OF SITE, AND POURING FOUNDATIONS WITHIN THE FUEL AREA. THE SLURRY BACKFILL OVER THE PIPES HAS BEEN PLACED OVER THE PIPES LOCATED AT THE NORTHWEST QUADRANT OF THE FUEL AREA. |
04/21/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7075 S PLUMER AV - GRADING BETWEEN TANK #3 and # 2 . CONTINUED PLACEING BEDDING MATERIAL FOR STORM DRAIN PIPE. |
04/21/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7073 S PLUMER AV - GRADING BETWEEN TANK #3 and # 2 . CONTINUED PLACEING BEDDING MATERIAL FOR STORM DRAIN PIPE. |
04/21/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7010 S PLUMER AV - GRADING BETWEEN TANK #3 and # 2 . CONTINUED PLACEING BEDDING MATERIAL FOR STORM DRAIN PIPE. |
04/20/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7075 S PLUMER AV. BACKFILLING THE STORM DRAIN PIPE .POURED THE SLURRY MATERIAL AT THE HIGH AREA OF STORM DRAIN. |
04/20/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7073 S PLUMER AV. BACKFILLING THE STORM DRAIN PIPE .POURED THE SLURRY MATERIAL AT THE HIGH AREA OF STORM DRAIN. |
04/20/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7010 S PLUMER AV. BACKFILLING THE STORM DRAIN PIPE .POURED THE SLURRY MATERIAL AT THE HIGH AREA OF STORM DRAIN. |
04/06/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED, MET WITH THE CONTRACTOR AND DISCUSSED THE ISSUES THAT WE ARE HAVING WITH THEIR PLACEMENT AND BACKFILL OF CORRUGATED PLASTIC DRAINAGE PIPE FOR THE STORM DRAIN SYSTEM. WE HAVE ADVISED THE CONTRACTOR THAT THEY MUST ADHERE TO THE MANUFACTURES SPECIFICATION FOR BEDDING AND SHADING MATERIAL. IN ALL AREAS THAT CANNOT ADHERE TO THAT THEY WILL NEED THE ENGINEER KF RECORD SUBMIT REVISED DRAWINGS FOR THE CHANGES THAT HE IS RECOMMENDING.HE MUST PROVIDE US WITH A SEALED CERTIFICATION LETTER FOR ALL CHANGES THAT HE IS APPROVING. CURRENTLY THERE LOOKS TO BE APPROXIMATELY 140 TO 150 FEET OF PIPE THAT WILL NOT MEET THE SPECS AND WILL NEED AN ALTERNATE METHOD FOR BACKFILLING. STARTING TODAY THEY WILL PHOTOGRAPH ALL PIPE THAT IS COMPLETED CORRECTLY, PROVIDE APPROXIMATE STATIONING, AND THIS WILL BE HIGHLIGHTED ON THE FIEKD PLANS AND INITIALED BY US FOR ACCEPTANCE. ONCE THE ALTERNATE METHOD IS APPROVED THEY WILL BE ALLOWED TO BACKFILL THAT PIPE. |
04/06/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7075 S PLUMER AV - BACKFILLING THE 8” STORM DRAIN LINE .WILL TAKE PHOTO WHEN BACKFILL AND SEND TO ME OR DAVID. |
04/06/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7073 S PLUMER AV - BACKFILLING THE 8” STORM DRAIN LINE .WILL TAKE PHOTO WHEN BACKFILL AND SEND TO ME OR DAVID. |
04/02/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN |
04/02/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN |
04/02/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN |
03/30/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN FOR 7073 S PLUMBER AV. THE 6” STORM DRAINAGE DOES NOT HAVE THE 12” COVER .ENGINEERING NEED TO REVIEW THE DESIGN. |
03/30/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN . THE 6” STORM DRAINAGE DOES NOT HAVE THE 12” COVER .ENGINEERING NEED TO REVIEW THE DESIGN. |
01/20/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - 7010 S PLUMER AV - CN |
01/20/2021 | ENGR Grading Final | MHERANDEZ | Continued | Entered by RSALDAT1 - 7073 S PLUMER AV - CN |
01/20/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN |
11/07/2023 | ENGR Grading Final | Passed | Structure at rear of Santa Rita Park competed. | |
11/07/2023 | ENGR Grading Final | Passed | Structure at rear of Santa Rita Park competed. |