Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 09/09/2022 |
SITE - Stormwater Setup and Controls |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 04/06/2022 |
SITE - Stormwater Setup and Controls |
MHERNANDEZ |
Continued |
Entered by VVERA1 - CN |
| 03/14/2022 |
SITE - Stormwater Setup and Controls |
MHERNANDEZ |
Continued |
Entered by NGARCIA3 - CN / WORKING ON THE TRENCH DRAIN ON TH SOUTH EAST OF TH BUILDING .INFORMED THE CONTRACTOR THAT THEY NEED TO CLL IN INSPECTION EVERY TWO WEEKS |
| 05/12/2021 |
SITE - Stormwater Setup and Controls |
MHERNANDEZ |
Continued |
Entered by VLEON1 - |
| 05/11/2021 |
SITE - Stormwater Setup and Controls |
MHERNANDEZ |
Continued |
Entered by VLEON1 - CN/ THERE IS TWO AREAS THAT ARE UNEVEN .THE ENGINEER IS COME OUT TO LOOK AT WITH JENSEN TO RESOLVE THE PROBLEM. |