Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/20/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by RSALDAT1 - Approved |
| 05/26/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Anthony with LLoyd construction. Please schedule and stormwater follow up inspections biweekly and stormwater controls inspections and intermediate inspections as needed
|
| 05/18/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - Partially approved. Anthony with LLoyd construction at471-9612. Remote inspection for start up of new zoo entrance. Install signage and controls as needed. Schedule inspection of stormwater controls.
Please provide Inspector with digital copy of civil drawings. |
| 05/12/2020 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - |