Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 02/11/2021 |
SITE - Stormwater Setup and Controls |
MHERNANDEZ |
Approved |
Entered by VLEON1 - APPROVED |
| 02/04/2021 |
SITE - Stormwater Setup and Controls |
MHERNANDEZ |
Partial Approval |
Entered by VLEON1 - PARTIAL |
| 08/05/2020 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Inspection for stormwater piping
|
| 07/30/2020 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by JSCHNEI2 - Continued. Muddy track out is contained within the parking lot. |
| 07/16/2020 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by JSCHNEI2 - Continued. |
| 07/16/2020 |
SITE - Stormwater Setup and Controls |
IVR USER |
Cancelled |
Entered by IVR USER - IVRS - RI canceled |
| 05/26/2020 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Anthony with LLoyd construction. Please schedule and stormwater follow up inspections biweekly and stormwater controls inspections and intermediate inspections as needed
|
| 05/22/2020 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Waddle has been installed along perimeter fencing. Please post SWPPP signage and site address.
|
| 05/14/2020 |
SITE - Stormwater Setup and Controls |
DROBERTS |
Continued |
Entered by DROBERT5 - TALKED TO ANTHONY AND HAVE ADVISED HIM THAT FROM MY CONVERSATION WITH LOREN MAKUS ON THIS DATE THE PERMIT SHOULD BE ISSUED SHORTLY, THEY ARE ABLE TO START THEIR WORK AT THIS TIME. |